Step 2 Install a communications cable to the UPS.
The figures show the communications port of the UPS, using the UPS5000-S-(50
kVA–800 kVA) as an example. For other models, see the specific manual.
Figure 5-31 Installing a communications cable
----End

5.3 Combining Cabinets

Prerequisites
● The SmartLi supports the combination of up to five cabinets.
● When multiple cabinets are connected in parallel, only the master cabinet has
● When cabinets are combined, a battery bus bar box (BBB box) is required. For
Procedure
Step 1 Install each cabinet in sequence according to the installation method of a single
cabinet.
Step 2 Combine cabinets.
Issue 09 (2023-03-26)
NO TICE
NO TICE
an LCD.
details about how to install a BBB box, see
BGA001 BBB Box User Manual .