Figure 3-28 Installing a control cable
----End

3.3 Combining Cabinets

Prerequisites
Procedure
Step 1 Install each cabinet in sequence according to the installation method of a single cabinet.
Step 2 Combine cabinets.
Issue 04 (2019-09-16)
The SmartLi supports the combination of up to five cabinets.
When multiple cabinets are connected in parallel, only the basic cabinet has an LCD.
When cabinets are combined, a battery bus bar box (BBB box) is required. For details
about how to install a BBB box, see PDU8000-(0630, 1250, 2000) DCV8-BGA001 BBB
Box User Manual.