Step 2 Install a communications cable to the UPS.
The figures show the communications port of the UPS, using the UPS5000-S-(50
kVA–800 kVA) as an example. For other models, see the specific manual.
Figure 3-30 Installing a communications cable
----End

3.3 Combining Cabinets

Prerequisites
● The SmartLi supports the combination of up to five cabinets.
● When multiple cabinets are connected in parallel, only the basic cabinet has an
● When cabinets are combined, a battery bus bar box (BBB box) is required. For
Procedure
Step 1 Install each cabinet in sequence according to the installation method of a single
cabinet.
Step 2 Combine cabinets.
Issue 08 (2022-11-15)
NO TICE
NO TICE
LCD.
details about how to install a BBB box, see
BGA001 BBB Box User Manual .