Transportation, Unpacking, And Checking - Huawei SmartLi 1.0 User Manual

Hide thumbs Also See for SmartLi 1.0:
Table of Contents

Advertisement

SmartLi 1.0
User Manual
Phillips
screwdriver
(M3/M4/M5/M6/
M8)
Phillips insulated
torque
screwdriver
(M4/M6)
Table 5-1
tools required, see the document for each component. Prepare tools based on site requirements.

5.1.3 Transportation, Unpacking, and Checking

● To prevent the equipment from falling over, secure it to a pallet truck using
● After placing the equipment in the installation position, unpack it and take care
● Before unpacking batteries, check whether the packaging is intact. Do not use
● After unpacking, check whether the fastening components and removable
● If the installation environment is poor, take dustproof and anti-condensation
Issue 09 (2023-03-26)
Insulated torque
wrench
(M6/M8/M12/
M16)
-
-
NO TE
lists only the common tools for installation and cable connection. For more dedicated
NO TICE
ropes before moving it. Move the equipment with caution to avoid bumping or
falling, which may damage the equipment.
to prevent scratches. Keep the equipment stable during unpacking.
batteries with damaged packaging. If any damage is found, notify the carrier
and manufacturer immediately.
components are loose. If they are loose, notify the carrier and manufacturer
immediately.
measures (for example, use a dust cover, plastic film, or fabric cloth) after
unpacking batteries to prevent condensation and dust buildup, which may
corrode the batteries.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installation and Cable Connection
Tools and Instruments
Heat shrink
tubing
-
-
Insulated
adjustable wrench
-
-
45

Advertisement

Table of Contents
loading

Table of Contents