Step 12 Remove the valve positioning kit, open the valve, reinstall the positioning kit, and
secure it.
Slowly open the valve. To avoid unexpected blowout, do not quickly open the
valve.
Issue 09 (2023-03-26)
Figure 8-11 Cutting off the end of the fire-trace tube
Clamp the end of the fire-trace tube to the threaded nozzle using a pipe
holder.
NO TICE
– Hold the pipe holder close to the end to avoid bending the tube during
pipe insertion.
– Ensure that the nut and riser screw thread are routed through the fire-
trace tube.
Figure 8-12 Install a fire-trace tube
Tighten the connection nut to 7 N·m using an adjustable torque wrench.
NO TICE