5.4 Verifying the Installation

Table 5-2 Check items and acceptance criteria
No.
01
02
03
04
05
06
07
Issue 09 (2023-03-26)
Item
Cabinet installation
Neat arrangement
Cable layout
Cable labels
Cable ties
Cable connections
Grounding
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installation and Cable Connection
Acceptance Criteria
The cabinet is securely installed and does
not tilt due to vibration.
The adjacent cabinets are neatly
arranged and secured with connecting
kits.
Cables are routed properly and cable
routing meets customer requirements.
Both ends of a cable are labeled. Labels
are concise and easy to understand.
Cable ties are secured evenly and no burr
exists.
1. Bolts are tightened to the required
torque and marked in red and blue
after double-check.
2. Battery cables are securely connected.
For the cables secured by screws, the
spring washers are leveled.
The resistance between the cabinet
ground bar and the equipment room
ground bar is less than 0.1 ohm.
70