Huawei SmartLi 1.0 User Manual page 72

Hide thumbs Also See for SmartLi 1.0:
Table of Contents

Advertisement

SmartLi 1.0
User Manual
Context
● Route cables from inside out.
● After routing cables, use sealing putty to seal the gaps between the cables and
● If the load of a single battery cabinet is less than or equal to 150 kW, you are
Figure 5-29 Setting I1 to the MIN value
Procedure
Step 1 Install power cables.
Only the UPS system where the battery neutral wire is not connected is supported.
Figure 5-30 Installing power cables
Issue 09 (2023-03-26)
NO TICE
the cabinets.
advised to set the I1 value of the battery circuit breaker to the MIN value
shown in the figure and use cables with a cross-sectional area of 120 mm
larger. If the load of a single battery cabinet is greater than 150 kW, you are
advised to use cables with a cross-sectional area of 150 mm
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installation and Cable Connection
2
or larger.
2
or
65

Advertisement

Table of Contents
loading

Table of Contents