Huawei SmartLi 1.0 User Manual page 61

Hide thumbs Also See for SmartLi 1.0:
Table of Contents

Advertisement

SmartLi 1.0
User Manual
Knock the expansion bolt into the hole until the expansion tube completely fits
into the hole. The expansion sleeve must be completely buried under the ground
to facilitate subsequent installation.
Figure 5-12 Installing an expansion bolt (unit: mm)
1.
2.
3.
4.
Step 3 Wheel the cabinet to the installation position.
Step 4 Open the front door and remove the four plugs from the bottom of the cabinet.
Figure 5-13 Removing plugs
Issue 09 (2023-03-26)
NO TICE
Drill a hole into the concrete floor using a hammer drill. The hole depth
ranges from 52 mm to 60 mm.
Slightly tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a hammer until the expansion sleeve is fully inserted
into the hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installation and Cable Connection
54

Advertisement

Table of Contents
loading

Table of Contents