Operating the system
Switching on the power supply
4.3 Switching on the power supply
4.4 Before heating up the boiler
4.4.1 Operating the WOS lever
4.4.2 Reloading intervals when operating with storage tank
Operating Instructions SP Dual compact | B1500319_en
❒ Turn on the main switch
➥ There is voltage at all of the boiler's components
➥ When the control has completed the system start, the boiler is ready for
operation
❒ Pull the lever of the cleaning system several times before heating up
(up and down 5 – 10 times)
Reloading intervals and amounts should be determined exclusively according to the
storage tank for efficient and environmentally-friendly heating.
❒ Check the store load status on the display
Load status
No bars or one bar in the store load status means that the
storage tank needs to be heated up by approx. 35°C.
⇨ See "Determining the right amount of fuel" [page 28]
Two bars in the store load status mean that the storage tank
needs to be heated up by approx. 20°C.
⇨ See "Determining the right amount of fuel" [page 28]
Three or four bars in the store load status mean that the storage
tank cannot take any more heat, or only a small amount. In this
case do not add fuel!
Procedure
4
27
Need help?
Do you have a question about the SP Dual compact 15 and is the answer not in the manual?