Combination With Storage Tank; Chimney Connection/Chimney System - Fröling SP Dual compact 15 Operating Instructions Manual

Dual fuel boiler
Hide thumbs Also See for SP Dual compact 15:
Table of Contents

Advertisement

3

3.6 Combination with storage tank

3.7 Chimney connection/chimney system

24
You can find more detailed information about storage tank design in the boiler
assembly instructions.
NOTICE! See "Design Information" section in the assembly instructions SP Dual
compact
EN 303-5 specifies that the entire flue gas system must be designed to prevent,
wherever possible, damage caused by seepage, insufficient feed pressure and
condensation. Please note in this respect that flue gas temperatures lower than 160K
above room temperature can occur in the permitted operating range of the boiler.
NOTICE! Please see the technical data contained in the assembly instructions for
further information about standards and regulations as well as the flue gas
temperatures when clean and the other flue gas values!
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Notes for operating a heating system
Combination with storage tank

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SP Dual compact 15 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sp dual compact 20

Table of Contents