Sign In
Upload
Manuals
Brands
Fröling Manuals
Industrial Equipment
Lambdamat LM 800
Fröling Lambdamat LM 800 Manuals
Manuals and User Guides for Fröling Lambdamat LM 800. We have
2
Fröling Lambdamat LM 800 manuals available for free PDF download: Installation Instructions Manual, Operating Instructions Manual
Fröling Lambdamat LM 800 Installation Instructions Manual (72 pages)
Brand:
Fröling
| Category:
Industrial Equipment
| Size: 11 MB
Table of Contents
Table of Contents
2
General
4
Safety
5
Hazard Levels of Warnings
5
Qualification of Assembly Staff
6
Personal Protective Equipment for Assembly Staff
6
Design Information
7
Overview of Standards
7
General Standards for Heating Systems
7
Standards for Structural and Safety Devices
7
Standards for Heating Water
7
Regulations and Standards for Permitted Fuels
8
Installation and Approval
8
Installation Site
8
Chimney Connection/Chimney System
9
Connection Line to the Chimney
10
Measuring Port
11
Draught Limiter
11
Domestic Hot Water
12
Pressure Maintenance Systems
13
Storage Tank
14
Return Lift
14
Technical Information
15
Dimensions
15
Components and Connections
16
Technical Specifications
17
Installation
20
Transport
20
Temporary Storage
20
Positioning
20
Fitting the Ash Duct for Removing Ash from the Combustion Chamber (Optional)
21
Positioning at the Installation Site
22
Moving the Boiler in the Boiler Room
22
Operating and Maintenance Areas of the Equipment
22
Laying Firebricks in the Combustion Chamber
23
Fireclay Lining Overview
23
General
24
Laying Firebricks
25
Laying Arch Bricks
26
Installing the Boiler
27
General Information
27
Bolting Together the Combustion Chamber and Heat Exchanger
28
Removing the Various Blanking Plugs and Fitting the Igniter Tube for the Automatic Ignition
28
Fitting the Immersion Sleeves for the Thermal Discharge Valve and Undergrate Sensor
29
Installing the Stoker Unit
30
Installing the Hydraulic Stoker Unit
30
Installing the Air Controllers
31
Fitting Thermal Insulation to the Boiler
32
Fitting the Insulation Base Frame
33
Mount the Side Panels and Safety Temperature Limiter (STL)
36
Assembling the Covers
39
Fitting the Door Contact Switch
40
Install the Ash Removal Unit of the Combustion Chamber Onto the Lateral Ash Container (Optional)
42
Installing the Underpressure Controller
44
Installing the Combustion Chamber Overpressure and Temperature Sensors
44
Fitting the Broadband Probe and Sensors
45
Installing the Servo-Motors
46
Fitting the Combustion Air Fan
47
Fitting the Automatic Ignition (Optional)
47
Fitting an Additional Ignition for Hydraulic Stoker Unit (Optional)
48
Fitting the Reversing Chamber Door
49
Fitting the Compressed Air Cleaner (Optional)
50
Fitting the Ash Sliding System (Optional)
51
Installing Flue Gas Recirculation FGR (Optional)
52
Assembling the FGR Underpressure Controller (Optional)
56
Flue Gas Piping
56
Hydraulic Connection
58
Thermal Discharge Safety Device Connection
58
Thermal Discharge Safety Device with Zone Valve
59
Connecting up the Slide-On Duct Cooling
61
Power Connection and Wiring
62
Potential Equalisation
62
Final Installation Steps
63
Checking the Position and Seal of the Burning and Combustion Chamber Door
63
Positioning the Burning Chamber and Combustion Chamber Door
64
Commissioning
65
Before Commissioning / Configuring the Boiler
65
Compressed Air Cleaner (Optional)
66
Initial Startup
66
Permitted Fuels
66
Non-Permitted Fuels
68
Heating up for the First Time
68
Screed Drying
69
Decommissioning
70
Out of Service for Long Periods
70
Disassembly
70
Disposal
70
Advertisement
Fröling Lambdamat LM 800 Operating Instructions Manual (64 pages)
Brand:
Fröling
| Category:
Boiler
| Size: 2 MB
Table of Contents
Table of Contents
2
General Information
4
Lambdamat LM 800-1000 Product Overview
5
Safety
7
Hazard Levels of Warnings
7
Pictograms Used
8
General Safety Information
9
Permitted Uses
10
Permitted Fuels
10
Non-Permitted Fuels
12
Qualification of Operating Staff
12
Protective Equipment for Operating Staff
12
Safety Devices
13
External Safety Devices
14
Residual Risks
15
Emergency Procedure
16
Overheating of the System
16
Smell of Flue Gas
16
Fire in the System
16
Notes for Operating a Heating System
17
Installation and Approval
17
Installation Site
17
Combustion Air Supply at the Installation Room
18
Domestic Hot Water
19
Pressure Maintenance Systems
20
Return Lift
21
Storage Tank
21
Chimney Connection/Chimney System
21
Operating the System
22
Assembly and Initial Startup
22
Filling/Refilling the Store with Fuel
23
Loading of Fuel for a Partially Emptied Store with Rotary Agitator
24
Loading Fuel into an Empty Fuel Store with a Rotary Agitator
24
Blowing in Fuel for a Partially Emptied Store with Rotary Agitator
25
Blowing in Fuel for an Empty Store with Rotary Agitator
25
Blowing in Pellets for a Store with Pellet Screw
26
Loading Fuel in a Store Space with a Sliding Floor Discharge Unit
27
Loading Fuel in a Store Space with a Horizontal Screw Discharge Unit
28
Loading Fuel in a Store Space with an Inclined Screw Discharge Unit
28
Drainage of Fuel Store
29
Heating up the Boiler
30
Switching on the Power Supply
30
Switching on the Boiler
30
Regulating the Boiler
30
Switching off the Boiler
30
Switching off the Power Supply
31
Servicing the System
32
General Information on Servicing
32
Required Tools
34
Inspection
35
Checking the System Pressure
35
Checking the Thermal Discharge Safety Device
35
Checking the Safety Valve
35
Checking the Geared Motors
35
Checking the Quick Vent Valve
36
Checking the Draught Controller Flap
36
General Weekly Inspection
36
Cleaning
37
Ash Container for Combustion Chamber (Optional)
37
Cleaning the Combustion and Burning Chamber
39
Emptying the Multicyclone Ash Container
41
Maintenance Tasks
42
Periodic Inspection and Cleaning
42
Periodic Inspection and Cleaning (Approx. 1,000 Hrs)
43
Periodic Inspection and Cleaning (Approx. 3,000 Hrs)
47
Maintenance Instructions for Hydraulic System
55
Emissions Measurement by Chimney Sweep or Regulatory Body
56
Switch on the System
56
Start Emissions Measurement
57
Maintenance Agreement / Customer Service
57
Replacement Parts
58
Disposal Information
58
Disposal of the Ash
58
Disposal of System Components
58
Troubleshooting
59
General Faults in the Power Supply
59
Behaviour of System after a Power Failure
59
Excessive Temperature
59
Faults with Fault Message
60
Procedure for Fault Messages
60
Advertisement
Related Products
Fröling Lambdamat LM 850
Fröling Lambdamat LM 900
Fröling Lambdamat LM 1000
Fröling Lambdamat LM 10001
Fröling Lambdamat LM 800-1000 KOM
Fröling Lambdamat LM 750
Fröling Lambdamat LM 1500
Fröling Lambdamat LM 650
Fröling Lambdamat LM 650 KOM
Fröling Lambdamat LM 750 KOM
Fröling Categories
Boiler
Industrial Equipment
Boiler Supplies
Heating System
Pellet stove
More Fröling Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL