2.2.2 Mechanical Installation

The switch platform can be rack mounted and is designed for installation in a standard 19" rack. The power
side of the switch includes a hot-swap power supply module, a blank cover for an optional second PSU for
redundancy, a hot-swap fan tray, system LEDs, and management connection ports. The hot-swap fan module
provides front to back air flow. The rear of the switch has the QSFP ports.
The switch platform contains auto-sensing 90 - 264 VAC connections for all possible PSUs.
The installer should use a rack capable of supporting the mechanical and environmental characteristics of a
fully populated platform.
2.2.2.1 Installing the Switch in the Rack
Tools needed:
Phillips Screwdriver
ESD Strap
ESD mat
Disposal of this equipment should be in accordance to all national laws and reg-
ulations.
This equipment should be installed in compliance with local and national elec-
trical codes.
There is a risk of explosion should the battery be replaced with a battery of an incorrect
type.
Dispose of used batteries according to the instructions.
The rack mounting holes conform to the EIA-310 standard for 19-inch racks. Take pre-
cautions to guarantee proper ventilation for air intake at the power side of the chassis
and exhaust at the connector side in order to maintain good airflow at ambient temper-
ature. Cable routing in particular should not impede the air exhaust from the chassis.