Oracle ZS3 Series Owner's Manual page 145

Zfs storage appliance customer
Hide thumbs Also See for ZS3 Series:
Table of Contents

Advertisement

8.
Slide the power supply into the bay (1) until it stops.
9.
To seat the power supply, rotate the release handle upward (2) until it locks in
place. This action of rotating the handle upward draws the power supply into the
controller and engages it with the internal connector.
The latch at the hinge of the handle must engage the slot at the bottom of the power
Note -
supply bay.
Connect the power cord to the power supply.
10.
Verify that the green AC Present status indicator is lit.
11.
12.
Go to the Maintenance > Hardware screen of the BUI. Click the right-arrow icon
for the controller, click PSU, and verify that the status icon
newly installed power supply. To view details about the new power supply, click
its information icon.
13.
If a fault does not self-clear, see
"Repairing Active Problems" on page
Replacing a ZS4-4 Power Supply
is green for the
39.
Servicing the ZS4-4 Controller
145

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZS3 Series and is the answer not in the manual?

This manual is also suitable for:

Zs5 seriesZs4-4De 24 seriesZs5-4Zs5-2Zs3-4 ... Show all

Table of Contents