New Holland LS140 Workshop Manual page 617

Hide thumbs Also See for LS140:
Table of Contents

Advertisement

SECTION 82 - FRONT LOADER (BOOM AND MOUNTING PLATE)
6. Attach the lower link rear with tapered pivot pins
and retaining hardware. Tighten the hardware,
making sure the pin is straight in the main boom.
7. With the main boom, upper, and lower links at-
tached, the pivot pins and hardware must be
properly seated.
Torque the pin retaining hardware to the following
torques:
1. Lower link - 224 N·m (165 ft. lbs.)
2. Upper link - 108 N·m (80 ft. lbs.)
3. Cylinder pivot (lower) - 108 N·m (80 ft. lbs.)
4. Cylinder pivot (upper) - 38 N·m (28 ft. lbs.)
8. After the pivot pin retaining hardware is torqued,
the pins must be properly seated. Using a ham-
mer, strike the head of the bolt and pin several
times to seat the tapered pin in the taper in the
ROPS. Retorque the hardware to specified
torque. Repeat this process until the torque is
maintained.
9. Reinstall the cylinders to the boom upper pivot.
10. Reinstall the boom hydraulic tubes and hoses if
removed. Position the tubes at 1, the front of the
boom to maintain clearance between boom and
tubes. The tubes must be properly positioned or
the tubes will contact the corner of the ROPS
(cab) at 2 when the boom is raised and lowered.
11. Reattach the tubes to the Z-bracket, 3, and install
the quick couplers. Install the tube clamps, 4,
front shown. Reattach the hoses to boom tubes
at 5.
82-28
Copyright © New Holland
61
2
2
1 1
3
1
62
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls150

Table of Contents