Checking The Scope Of Delivery; Scope Of Delivery Of The Cooktop Extractor; Scope Of Delivery Of The Cooktops; Tools And Aids - bora Professional 3.0 Installation Instructions Manual

Hide thumbs Also See for Professional 3.0:
Table of Contents

Advertisement

T
when using a window contact switch, only devices will be installed
which meet the requirements of standard IEC 60730-1:2013 +
AMD1:2015 or EN 60730-1:2016 (or a more recent IEC update or
EN standard) for type 2 control units and devices (e.g. window
contact switch UFKS).
No window contact switches may be installed that separate
the control unit from the power supply (phase separation).
Only the Home In interface is to be used
If the cooktop extractor is used exclusively in recirculation
mode, operation with an open fireplace is possible without
any additional safety measures.
4.2

Checking the scope of delivery

Checking the scope of delivery
u
Make sure the delivery is complete and check it for damage.
u
Immediately inform the BORA Service TeamTeam if parts are
missing or damaged.
u
Do not under any circumstances install parts which are damaged.
u
Dispose of transport packaging in the proper manner
(see "5 Decommissioning, disassembly and disposal").
4.2.1
Scope of delivery of the cooktop
extractor
Scope of delivery
Operating instructions
Installation instructions
Cooktop extractor
Height adjustment plate set
Installation clamps
Control knob
Stainless steel grease filter
Filter tray
Maintenance tray
Cover flap
Power supply cable
Control knob cable
Additional scope of delivery for PKA3/PKA3AB
CAT 5e communication cable
Control unit
Duct piece
Seal
Scope of delivery
Tab. 4.1
www.bora.com
4.2.2

Scope of delivery of the cooktops

Scope of delivery
Operating instructions
Installation instructions
Cooktop
Height adjustment plate set
Fixing screws
Mounting brackets
Control knob
Control knob cable
Cooktop-to-cooktop-extractor communication cable
Additional scope of delivery for Tepan
Tepan spatula
Additional scope of delivery for gas cooktop
Cast-iron pan support
Nozzle set G20/20 mbar natural gas PKGDS2020
Cylindrical/conical transition piece
Seal
Additional scope of delivery for Australia and New
Zealand:
1.00 kPa gas regulator with test-point adapter for
natural gas (NG)
Flexible gas connection hose, length 500 mm, 1/2"
Quantity
external thread (AS/NZS 1869)
1
Test-point adapter for liquified petroleum gas (LPG)
1
G20/10 mbar nozzle set (NG/1.0 kPa) – pre-installed
1
G31/27.5 mbar nozzle set (ULPG/2.75 kPa)
1
Scope of delivery
Tab. 4.2
4
1
4.3

Tools and aids

1
The following tools, among others, are required to correctly install the
1
cooktop:
1
T
pencil
1
T
tape measure or folding metre stick
1
T
conventional or battery-operated drill
T
1
Ø50 mm centre bit
T
black, heat-resistant silicone sealant
T
slotted screwdriver
1
T
size 10 Torx screwdriver/key
1
T
size 20 Torx screwdriver key
1
1
Installation
EN
Quantity
1
1
1
1
4
4
2
2
1
1
2
1
1
1
1
1
1
1
1
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pka3Pka3abPkfi3Pkiw3Pki3Pkcb3 ... Show all

Table of Contents