Control Bus Cable Location - GE FGC TLE Series Manual

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

4.9.3 Control bus cable location

WARNING !
This installation must be verified by trained personnel before the initial start-up.
ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.
Keep SELV cables separated from HIGH VOLTAGE cables.
Q1
Fig. 4.9.3-1 TLE Series 160 - 200 - 225 - 250
View electronic module on intermediate unit
Access to the control bus connection
The communication bus cable connectors are placed on the two boards "P13/P14 – IM0022 – Bus
Interface Board" (see Fig. 4.9.3-1 and 4.9.3-2).
J1B/2÷5
J1B/1
J1A/2÷5
J1A/1
Fig. 4.9.3-3 View electronic module on intermediate unit
Modifications reserved
GE_UPS_ISG_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
J1
B
J2
J1
A
J2
Fig. 4.9.3-2 TLE Series 300 - 400 - 500
View electronic module on intermediate unit
Control bus cables connection
Plug the cables J1A – J2A (1/2/3/4/5) and J1B –
J2B (1/2/3/4/5) on the connectors J1A – J2A and
J1B – J2B placed on the two boards "P13/P14 –
IM0022 – Bus Interface Board".
Fix the communication bus cables J1A – J2A
(1/2/3/4/5) and J1B – J2B (1/2/3/4/5) with the
provided cable clamps "A".