Rpa Parallel System - Control Bus Connection - GE LP 33 Series Operating Manual

60 – 80 – 100 – 120 kva 400 vac ce / series 2
Hide thumbs Also See for LP 33 Series:
Table of Contents

Advertisement

5.8.7 RPA Parallel System - Control bus connection

WARNING !
This operation must be performed by trained personnel before the initial start-up
(ensure that the UPS installation is completely powered down).
ON
OFF
OFF
Fig. 5.8.7-1 LP 33 Series 60 - 80 kVA - Access to the RPA board
Q2
Q2
O N
OFF
Fig. 5.8.7-2 LP 33 Series 100 - 120 kVA - Access to the RPA board
Modifications reserved
OPM_LPS_33E_60K_M12_2GB_V010.doc
A
C
ON
A
ON
OFF
Access to the RPA board
D
1 - Open the front door "A" of the
UPS cabinet.
2 - Remove the front panel "B".
B
3 - Remove with appropriate tool
the metallic window "C" from
the metal screen "D".
C
D
B
NOTE !
Put in place the
front
panel
paying attention to
not damaging the
control bus cables.
Page 45/103
Operating Manual LP 33 Series 60-80-100-120 kVA / S2
"B"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents