GE FGC TLE Series Manual page 378

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

XTR2A connector
Connection
XTR2A - Connector
H9
H10
H11
H13
H14
H15
Modifications reserved
GE_UPS_ISG_TLE_SUL_M62_1M0_2US_V010.docx
Critical Power
XTR2A
Power Section cabinet
H9-10-11
XTR2A
!
Fig. 4.7.3-3 TLE Series 625 & 750 – Control cables interconnection
Already connected on
"In/Out Section cabinet"
"Power Section cabinet"
"Power Section cabinet"
"Power Section cabinet"
"Power Section cabinet"
"Power Section cabinet"
"Power Section cabinet"
H13-14-15
H9-10-11
H13-14-15
The cables must be fixed
and do not touch
the bus bars
"Power Section cabinet" - XTR2 Connector
"In/Out Section cabinet" – H9 LEM
"In/Out Section cabinet" – H10 LEM
"In/Out Section cabinet" – H11 LEM
"In/Out Section cabinet" – H13 LEM
"In/Out Section cabinet" – H14 LEM
"In/Out Section cabinet" – H15 LEM
Installation Guide TLE Series 625 - 750 - 1000 UL S2
In/Out Section cabinet
Connecting to
Page 30/69