GE FGC TLE Series Manual page 272

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

Main failure count
The total number of minor Utility faults (Bypass Utility out of tolerance faults).
Number of fast transients
The number of fast transients occurred on the bypass utility on the last seven days.
Bypass quality index
The statistic evaluation in % (100= good; 0= bad) of the Bypass utility.
Status
Bypass status: free / blocked.
Temperature
"XXX" indicates disabled function.
Temperature a
The temperature of the Inverter bridge (lower module).
Temperature b
The temperature of the Inverter bridge (upper module).
Modifications reserved
GE_UPS_USM_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
BYPASS SCREEN
Frequency
The frequency of the input Utility.
Voltage L1 / Voltage L2 / Voltage L3
3-phase Utility voltage PHASE
/NEUTRAL.
Current L1 / Current L2 / Current L3
Input Utility current for the 3-phases.
INVERTER SCREEN
Frequency
The output frequency of the Inverter.
Voltage L1 / Voltage L2 / Voltage L3
3-phase
PHASE/NEUTRAL.
Status
The synchronization status of the
Inverter with respect to Utility:
Synchronized.
-
Not synchronized.
-
output
voltage
Page 31/91
User Manual TLE Series 160 - 500 UL S2B

Advertisement

Table of Contents
loading

Table of Contents