GE FGC TLE Series Manual page 360

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

J35
µP
XA
CR
Fig. 2.2-6 TLE Series 1000 - General view without protection panels
1a
Opening for top cable entry (* - for Utility input and Load output connection)
1b
Opening for top cable entry (* - for External Battery connection)
2a
Opening for bottom cable entry (* - for Utility input and Load output connection)
2b
Opening for bottom cable entry (* - for External Battery connection)
3
Bus bars for Utility input and Load output
4
Bus bars for External Battery connection
CI
Customer Interface Board (see Fig. 2.2-4)
CR
Connectivity Rack
J35µP
Serial port RS232 for IMV protocol
Q1
UPS Output switch
RPA
RPA board (Redundant Parallel Architecture) for Parallel System (option)
SNMP
3-ph SNMP/WEB plug-in adapter (option - see Fig. 2.2-4)
XA
Terminals for "EPO - Emergency Power Off" connection and 24Vdc for external battery switch
*)
Remove this panel or provide means to capture metal filings from cutting conduit entry holes
Modifications reserved
GE_UPS_ISG_TLE_SUL_M62_1M0_2US_V010.docx
RPA
Critical Power
1b
2b
4
Q1
2a
Installation Guide TLE Series 625 - 750 - 1000 UL S2
1a
3
Q1
Page 12/69

Advertisement

Table of Contents
loading

Table of Contents