Installation notices in case of power connection with Dual Input Utility
Q1
Fig. 4.8.2-3 TLE Series 300 - 400 - 500 Interconnection links BR1, BR2 and BR3
NOTE !
For separate Bypass and Rectifier input configuration, the interconnection links
BR1, BR2 and BR3 MUST BE REMOVED (see Fig. 4.8.2-3).
Modifications reserved
GE_UPS_ISG_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
Q1
BR1
(3x20x1mm / L=220mm)
36
BR2
37
BR1, BR2 and BR3
MUST BE REMOVED
BR1
BR2
BR3
36
(3x20x1mm / L=220mm)
37
BR3
(3x20x1mm / L=220mm)
38
38
Installation Guide TLE Series 160 - 500 UL S2B
Page 39/60