GE FGC TLE Series Manual page 52

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

Battery temperature sensor
The "Battery cabinet" is supplied with a battery temperature sensor cable (standard length: 5m).
This is to compensate the battery charge voltage (only for type VRLA without maintenance) based on
the working temperature.
The battery temperature sensor must be mounted and fixed in the battery cabinet while the
"Connector J14" must be connected to board "P19 - IM0284 System Interface / J14" of the UPS.
Battery
cabinet
Battery
temperature
sensor
DANGER !
RISK OF ELECTRIC SHOCK: The battery sensor is connected to the primary circuit.
The cable must be routed under the floor or through conduit, so that it's not
accessible and pulling is unlikely to happen.
Keep this cable separated from SELV cables.
Modifications reserved
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
Critical Power
XA
Q1
Fig. 4.8.3-2 Access to "P19 - IM0284 System Interface / J14"
Wiring shall comply
to local regulations !
Output
cables
To UPS
J14
J30
P19 - IM0284
Fig. 4.8.3-3 Battery temperature sensor connection
J12
J6
J4
J23
K3
J1
C35
J9
IM0284C
BARCODE
8600096911P
J11
R38
R86
R98
R99
R100
R101
R102
J27
J26
R22
R16
R26
R36
R46
R56
R66
R20
R15
R25
R37
R45
R55
R65
R75
R19
R27
R28
R32
R44
R54
R64
R74
R18
R13
R23
R30
R43
R53
R63
J7
J8
J25
P19 - IM0284
J22
System Interface board
J14 - Battery temperature sensor
J12
J6
J23
K3
J9
J11
R38
R86
R98
R99
R100
R101
R102
R22
R16
R26
R36
R46
R56
R66
R20
R15
R25
R37
R45
R55
R65
XA
R19
R27
R28
R32
R44
R54
R64
R18
R13
R23
R30
R43
R53
J7
J8
J25
J22
Q1
Installation Guide TLE Scalable Series 40 - 150 UL S1
J3
J5
J2
C64
C63
J35
TP4
TP5
C61
C62
J33
L2
L1
C34
J37
J34
J32
J36
J14
J38
J31
J3
J4
J5
J2
C64
C63
TP5
TP4
C62
C61
J1
L2
J33
C35
C34
L1
C39
C42
C36
HDR1
HDR2
IM0284C
BARCODE
8600096911P
J27
J26
J32
R75
R74
R63
J14
P19 - IM0284
System Interface board
Page 36/53
J35
J37
J34
J36
J38
J31

Advertisement

Table of Contents
loading

Table of Contents