GE FGC TLE Series Manual page 437

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

4.3.7 TLE Series 625 – 750 – 1000 with "IP Ring Bus" (option)
Maintenance of the TLE Series 625 – 750 - 1000 whit "IP RING BUS" option
Electronic bracket
XRB1
P3
XRB2
IM279
TLE Series Electronic Bracket
Fig. 4.3.7-1 TLE Series 625 – 750 – 1000 electronic bracket
WARNING !
All maintenance and service works must be performed by GE SERVICE
PERSONNEL !
TLE Series 625 – 750 – 1000 with "IP Ring Bus" option:
In case of "IP Ring Bus" option be aware that external hazardous voltage can
be supplied from the IP cabinet (FU1, FU2, FU3 / Fig. 4.3.7-2) to the IM0278
(J19.10, J19.7, J19.4 / Fig. 4.3.7-1) and to the connector XRB1 (Fig. 4.3.7-1) even
after UPS shut down.
To remove the hazardous voltages it is necessary to manually open the IP
cabinet fuses (FU1, FU2, FU3 / Fig. 4.3.7-2), checking the presence of any
voltage before working on the UPS.
Read carefully the documentation provided together with the external "IP
Ring Bus" cabinet.
Modifications reserved
GE_UPS_USM_TLE_SUL_M62_1M0_2US_V010.docx
Option in added into Electronic Bracket
P1
P2
IM278
Critical Power
Q1
TLE Series 1000 UL S1
P2
P3 + P18
P2
J_SSM2
J6 J7
J18
J9
J24
J23
J7 J8
J18
IM279
IM278
J20
J21
J19
3-8-1-6
1-6-2-7-4-9
1-10-7-4
XRB2
XRB1
IP Ring Bus cabinet
1
1
1
FU3
FU1
FU2
2
2
2
FIELD WIRES
Fig. 4.3.7-2 IP Ring Bus fuses
Page 20/92
User Manual TLE Series 625 - 750 - 1000 UL S2

Advertisement

Table of Contents
loading

Table of Contents