Ensure the LED 1 (Rectifier) is lit before carrying out this procedure.
It indicates that the DC-link 1 and DC-link 2 has reached 400Vdc (see screen MEASURES /
Rectifier)!
3. Connect the battery to the UPS by closing the
"Battery Cabinet Breaker" (Pos. I).
NOTE !
Before performing the next procedure (4) make sure that the LED 3 (Booster/Battery
charger) is lit.
4. Insert the Inverter performing the command "Inverter ON".
Perform the "Inverter ON" command from the screen:
Commands 1 / Inverter / ON.
Soft-start of Inverter indicated with blinking LED 2 (Inverter).
At the end of Soft-start the LED 2 (Inverter) remains lit.
LED ALARM turns Off and the LED LOAD PROTECTED must be lit.
The Synoptic Diagram must display the status
"LOAD SUPPLIED BY INVERTER".
Modifications reserved
GE_UPS_USM_TLE_SUL_40K_M15_1US_V010.docx
END OF PROCEDURE