Refrigerated Centrifuge for Robot Use Sigma 4-5KRL
Refrigerated Centrifuge for Robot Use Sigma 4-5KRL IVD
5 Set-up and connection
→
5.2.2
Customer-provided fuses
NOTE
32 / 113
The centrifuges are equipped with a mains power switch with an integrated
thermal circuit breaker.
•
Switch the unit off by actuating the mains power switch.
•
If it has tripped, let the circuit breaker cool for approximately 2 minutes.
•
Switch the unit on.
The centrifuge is now ready for operation.
Typically, the centrifuge must be protected with 16 Amp B fuses that are to
be provided by the customer.
To ensure safe disconnection in the event of a fault, an AC/DC-sensitive
RCD (residual current device) must be integrated in the wiring system of
the building.
Version 11/2017, Rev. 1.7.1 of 08/12/2022 • sb
Translation of the original operating manual,