With 1430Ffk-Fixed Framing Kit - Valor H6 Installation Manual

Direct vent zero clearance gas fireplace
Table of Contents

Advertisement

Installation
Install Appliance for Fixed Framing Kit
1. Unpack the 1430FFK kit checking that you have all
the pieces on hand.
Upper panel
LH side
panel
LH side
door
Lower
panel
1430FFK Kit content
2. On top of appliance's case, in front of the stand-off s,
remove the positioning brackets (2 screws each).
On top, each side of the window, remove the con-
vection brackets (1 nut/side); they are not used with
this kit.
42
Upper
panel
support
RH side
panel
RH side
door
Removable
panel
Barrier screen
With 1430FFK—Fixed Framing Kit
3. Fit the upper panel support to the top of the appli-
ance's case, angle facing rear, and secure (4 screws).
4. At bottom of appliance case, install the lower panel
provided with the kit, as indicated (3 nuts).
5. On the appliance, install the side panels as indicated
(3 screws per side).

Advertisement

Table of Contents
loading

This manual is also suitable for:

1400mn1400mp

Table of Contents