Venting Considerations When Framing - Valor H6 Installation Manual

Direct vent zero clearance gas fireplace
Table of Contents

Advertisement

Planning
Framing with Vertical Takeoff
Note: Min. 24" total
rise required
Framing with Horizontal Takeoff
Note: Min. 24" total
rise required
18
24" pipe section
Fireplace -
Left Side View
24" pipe section
Fireplace -
Left side view
Venting Considerations When
Framing
*Notes—ALL venting considerations
• Dimensions of venting are based on
using DuraVent elbows. Elbow curve
radius dimensions will vary when using
other brands. In general, other brands
have slightly bigger radius.
• 3 inches clearance to combustibles
required above horizontal pipe. Slope
horizontal pipe upwards 1/4 inch per
foot. 1 inch clearance required around
sides and bottom of horizontal pipe and
around vertical pipe.
• When calculating eff ective pipe lengths
subtract approximately 1-1/2 inch for
pipe joint - for example, a 12 inches pipe
section will add approximately 10-1/2
inches overall when connected.