Point Projection - Sokkia 30R Series Operator's Manual

Reflectorless total station
Table of Contents

Advertisement

• It is also possible to perform setting-out line measurement when [P-PROJ] on
the Meas mode screen.
Allocating the function key: ."24.2 Allocating Key Functions"
16.2

Point Projection

Before performing point projection, the baseline must be defined.
PROCEDURE
1. Define the baseline.
"16.1 Defining Baseline"
2. Select "Point Projection" in <Point
Projection>.
3. Press [EDIT], enter the point
coordinate.
• Press [OBS] to observe the
point to project.
• When recording the data as a
known point, press {FUNC}, and
then press [REC] on the second
page.
Recording method:
"22.1 Registering/Deleting
Known Point Data"
4. Press [OK] on the screen of step
3.
The following items are calculated
and displayed.
• Length: Distance along the
baseline from the first point to
the projected point (X direction).
16. POINT PROJECTION
Point projection
Stn. Orientation
Define baseline
Point Projection
P o i n t p r o j e c t i o n
1 0 3 . 5 1 4
N p :
1 0 1 . 4 2 3
E p :
1 2 . 1 5 2
Z p :
READ
OBS
P o i n t p r o j e c t i o n
L e n g t h
1 0 . 8 7 9 m
9 . 3 4 0 m
O f f s e t
d . E l e v
0 . 3 2 1 m
XYZ
REC
=
P1
EDIT
OK
S-O
75