Download Print this page

Samsung IAB Series Install Manual page 93

Led display
Hide thumbs Also See for IAB Series:

Advertisement

Product disassembly method – 1) Screen Desorption 110"
① Front 분해
SCREW
① BEZEL TOP/BOTTOM disassemble :
screw disassemble
1
2
3
④ Separated in order of outside → inside (1 → 2)
* Before separation, pull the bottom to create a space and
remove the CABLE first
MAGNET
② BEZEL SIDE disassemble : Magnet desorption
92
③ BRACKET-SUPPORT disassemble
Place the EPE PAD on the floor, place
the module facing the floor, and
assemble the COVER CORNER to prevent
damage.
BRACKET-SUPPORT L/R
SCREW MACHINE
SCREW SPECIAL
SCREW
LED R&D Lab(VD)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series