Download Print this page

Samsung IAB Series Install Manual page 129

Led display
Hide thumbs Also See for IAB Series:

Advertisement

Product disassembly method – 4) LED module replacement
□ Module disassemble
※ Decomposable to 2*3
① Check the module location that
needs to be disassembled.
Bridge Board 8 screw
decomposition
Remova
l
Remova
l
Module to work with
② Bridge Board Removal.
(mini board No separation
required)
23 screw
Step adjustment
decomposition
point
※ It is necessary to check if there is
a screw at the step adjustment
point
③ Disassembly of rear screw (23
pieces)
128
Floating
Connector
PU
PU
SH
SH
④ Pull from the front of the module to
the adsorber and press forward from
the back.
(Separation from the floating connector of the bridge board)
LED R&D Lab(VD)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series