Download Print this page

Samsung IAB Series Install Manual page 73

Led display
Hide thumbs Also See for IAB Series:

Advertisement

5. Frame Bezel Installation
① Install the left and right side bezels first.
- Check the degree of separation from the screen by facing the FRAME BEZEL SIDE on the left/right side of the CABINET.
- Move the front position according to the degree of separation and attach it
Check the degree
72
LED R&D Lab(VD)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series