Download Print this page

Samsung IAB Series Install Manual page 37

Led display
Hide thumbs Also See for IAB Series:

Advertisement

4. FRAME installation and cable connection
⑧ Connecting the cable in the frame section below
③ Connect BN39-02743B (OCM) to Main OCM1 connector, spread it over the L1 frame fixed injection, and hang it.
④ Connect BN39-02743B (OCM) to Main OCM2 connector, spread it over the L2 frame fixed injection, and hang it.
⑤ Connect BN39-02743A (OCM) to Main OCM3 connector, spread it over the R1 frame fixed injection, and hang it.
⑥ Connect BN39-02776A (OCM) to Main OCM4 connector, spread it over the R2 frame fixed injection, and hang it.
※ Mark the OCM cable connection location as SILK at the main b'd OCM connector location
LEFT-FRAME
L1
SMPS
B'd
Cable 고정용
고리 사출물
OCM고정
사출물
BN39-
02743B
RIGHT-FRAME
L2
R1
SMPS
B'd
①Relay
Inlet
Cable 연결
B'd
②L/R SPK
Cable 연결
BN39-
02743B
R2
SMPS
B'd
Inlet
B'd
BN39-
02743A
36
146" Reference
position
110" Reference
position
SMPS
B'd
MAIN
B'd
BN39-
02776A
Fig.1 Main b'd Silk mark
LED R&D Lab(VD)
BN39-02743B
BN39-02743B
BN39-02743A
BN39-02776A

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series