Download Print this page

Samsung IAB Series Install Manual page 38

Led display
Hide thumbs Also See for IAB Series:

Advertisement

4. FRAME installation and cable connection
⑨ Install the ASSY BRACKET P-FRONT by hanging it on the ASSY BRACKET P-FRAME..
- After installing 1st and 2nd in the middle, install them in order of 3rd and 4th.
- Be sure to comply with the installation order
- Since it is installed on hanging, it is raised and installed at an angle.
- The numbers L1, L2, R1, and R2 of each cabinet are arranged as shown in Figure 1.
3
1
2
4
L1
L2
R1
R2
Fig.2 Up and down at an angle
Fig.1 Install position 1 first
37
LED R&D Lab(VD)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series