Download Print this page

Samsung IAB Series Install Manual page 34

Led display
Hide thumbs Also See for IAB Series:

Advertisement

4. FRAME installation and cable connection
⑥ Install the ASSY BRACKET P-FRAME on the wall mount.
- When connecting the second set, repeat the previous page operation twice.
Fig.1
2SET Install
33
LED R&D Lab(VD)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series