4. Frame 설치 및 케이블 연결
Check the operation of each ASSY BRACKET P-FRONT installation.
⑩
- Connect the power of the SET power cord to check whether the entire LED is damaged or not and check the output.
Fig.1 Check the operation
Fig.2 Check the operation
Fig.3 Check the operation
after installing one
after installing two
after installing three
58
LED R&D Lab(VD)