Download Print this page

Samsung IAB Series Install Manual page 59

Led display
Hide thumbs Also See for IAB Series:

Advertisement

4. Frame 설치 및 케이블 연결
Check the operation of each ASSY BRACKET P-FRONT installation.
- Connect the power of the SET power cord to check whether the entire LED is damaged or not and check the output.
Fig.1 Check the operation
Fig.2 Check the operation
Fig.3 Check the operation
after installing one
after installing two
after installing three
58
LED R&D Lab(VD)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series