Samsung IER Series Installation Manual
Samsung IER Series Installation Manual

Samsung IER Series Installation Manual

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

Samsung Electronics
LED Display Installation Manual
IER / IFR Series
LH0**IER*LS
LH0**IER*FS
LH0**IFR*LS
LH0**IFR*FS

Advertisement

Table of Contents
loading

Summary of Contents for Samsung IER Series

  • Page 1 Samsung Electronics LED Display Installation Manual IER / IFR Series LH0**IER*LS LH0**IER*FS LH0**IFR*LS LH0**IFR*FS...
  • Page 2 Revision History Samsung Electronics Version Date (Y/M/D) Description 2020/03/20 New Release...
  • Page 3 ∙ Case when period between unpacking and turning on the power of products is spent more than 7days, even though it is under Samsung recommended storage condition. ∙ Case when production date on the label is exceed more than 6 months, even though vacuum packaging is no problem.
  • Page 4 Dehumidification guidance – during operation Samsung Electronics  Electrical short in package is possible to happen during products are working.  For keeping quality of products during installation, please refer below cautions. - If one of below case meet during operation, MUST do dehumidification process.
  • Page 5 Dew condensation due to overcooling Samsung Electronics  Even though meet with Samsung recommended operation condition, dew condensation is possible to happen when surface of products is colder than environment temperature or hot & humid air blow to cooled surface of products.
  • Page 6 Guidance of latest firmware Samsung Electronics  When install products, please update latest firmware on online - You can download latest firmware from SLM site. ∙ URL of SLM Page : https://www.secslm.com ∙ After login  Help  Download Center에서 Download ∙...
  • Page 7 Table of Contents Samsung Electronics 1. Product Information and Installation Precautions (P.2) 2. Preparation for Cabinet Installation (P.12) 3. Frame Kit (P.16) 4. Frame Installation (P.17) 5. Cabinet + Frame Installation (P.25) 6. S-Box Connection (P.29) 7. Settings / How to Use (P.47) 8.
  • Page 8 1. Product Information and Installation Precautions Samsung Electronics ◇ Model Line-up This Manual is an Installation Manual for IER/IFR , which contains information of (Appendix. IER-F/IFR-F) models below (Installation process is same for each pitch model) Cabinet Size IER (P2.0, P2.5, P4.0) IFR (P2.5, P4.0)
  • Page 9 1. Product Information and Installation Precautions Samsung Electronics ◇ Model specification IER / IFR IER-F / IFR-F Spec P2.0 P2.5 P4.0 P2.0 P2.5 P4.0 Width Size Height Vertical Resol ution Horizontal LED / Cabinet 64,800 82,944 32,400 16,200 20,736 8,100...
  • Page 10 1. Product Information and Installation Precautions Samsung Electronics ◇ Frame Kits configuration ※ Please refer to Appendix for information of IER-F / IFR-F Frame Kit (See page 14.) Frame kit Configuration Remarks for installation VG-LFR84FWL (32 sets) VG-LFR53FWL (15 sets)
  • Page 11 1. Product Information and Installation Precautions Samsung Electronics ◇ Installation precautions (LED damage) Precautions Images [Be careful of external impact or dropping] ① After removing the Cover-Corner from the product prior to installation, MODULE exercise caution to ensure that the LED surface is not exposed to physical Front ①...
  • Page 12  Requirements for indoor installation ※ ADA: Americans with Disabilities Act - Applicable to use of SAMSUNG wall mount (compliant with ADA) ∙ Gap between the product front and the wall: 99.5 mm ∙ Gap between the product rear and the wall: 35.5 mm 99.5 mm...
  • Page 13 1. Product Information and Installation Precautions Samsung Electronics  Fan flow rate depending on the number of installed cabinet rows ※ CFM = cubic feet per minute ※ Measurement based on one column No. of rows 1 to 3 4 Rows...
  • Page 14 1. Product Information and Installation Precautions Samsung Electronics  Requirements for using FAN  Vent requirements - Air vent: Should only be installed on the bottom - Use vents with an opening rate of at least 70% - Upper portion: Seal the entirety, ��...
  • Page 15 1. Product Information and Installation Precautions Samsung Electronics  Minimum gap for embedded installation (Applicable when a fan is not used) Air vent area Min. 500 mm (ceiling) Min. 60 mm Air vent area Min. 60 mm Min. 60 mm Min.
  • Page 16 1. Product Information and Installation Precautions Samsung Electronics  Minimum gap for installation on wall (Applicable when a fan is not used) Min. 500 mm (ceiling) Air vent area Air vent area Air vent area Air vent area Min. 300 mm (floor)
  • Page 17 1. Product Information and Installation Precautions Samsung Electronics ◇ Preparation for installation LED MODULE JIG Phillips (+) Electric screwdriver (model name: CY-LJRNLS) screwdriver ※ Recommende d sizes Service JIG Pliers Anti-static Holder Magnet Tool (BH81-00001A) gloves...
  • Page 18 2. Preparation for Cabinet Installation Samsung Electronics ◇ Preparation prior to installation ① Remove the tape on top of the package box and open the box. (See Fig.1.) ② Remove the Top–Cushion and open the shielding bag. Hold the handles inside, take out the set, and then remove the PE bag.
  • Page 19 2. Preparation for Cabinet Installation Samsung Electronics ④ Connect the power and check for a problem with the screen. (See Fig.4.) ※ See page 12 for details on how to check for a screen problem. ⑤ Unfasten the screws (four screws in total) and remove the corner covers. (See Fig.5.)
  • Page 20 2. Preparation for Cabinet Installation Samsung Electronics ◈ Note: Checking for a screen problem Power In Switch Button Power Out ◇ Connect the power cord that came with the product and turn on the product. Check that there is no LED damage and no problem is found on the screen.
  • Page 21 2. Preparation for Cabinet Installation Samsung Electronics ⑧ For cabinets placed on the edge, attach PET sheet before attaching PCB covers. ※ Attach PET sheet to all borders of the LED module (Fig.1), and attach PCB covers to the same outer sides where the...
  • Page 22 3. Frame Installation Samsung Electronics ① Make sure none of the following Frame Kit contents are missing. ※ Refer to attachment at last page for IER-F installation VG-LFR84FWL VG-LFR53FWL VG-LFR52SWL VG-LFR11SWL VG-LFR51PWL Qty (+spares) Item PIVOT ⓐ ASSY BRACKET SIDE ⓑ...
  • Page 23 3. Frame Installation Samsung Electronics ② On the left end, place the ⓐBracket Side and fasten the screws to install the Bracket (Fig.3). ※ Fasten one screw first, and use a clinometer to vertically align the right edges and fasten screws into the other holes.
  • Page 24 • Standard wood stud interval of 16” is supported. (24” is not supported.) Samsung Electronics is not responsible for problems caused as a result of failure to follow the requirements specified in the installation guide.
  • Page 25 3. Frame Installation Samsung Electronics ③ ⓑ Bracket Middle. Install the Incorrect Correct installation installation ※ First, check the holes into which to fix the ⓓ JIGs. (See Fig.1.) ※ Next, align the ⓓ JIG with the bracket holes and fasten the four screws. (See Fig.2.) Wall ⓐ,ⓑ,ⓒ...
  • Page 26 3. Frame Installation Samsung Electronics ⑤ After installing the Bracket Center, install the lowest row cabinets. (See Fig.6.) ⑥ After installing the cabinets, push the LED modules toward the middle and check the height difference between the cabinets on both ends and the LED modules.
  • Page 27 4. Frame Installation – Adjusting the Frame Samsung Electronics Center (Important) ◆Bracket Center’s usable section, • Install the Frame Center after a Frame Side and two Frame Middles are installed based on the VG-LFR53FWL. VG-LFR53FWL: Every 3 rows • Before installing...
  • Page 28 3. Frame Installation Samsung Electronics ※ If installing three or more ASSY BRACKETs, adjust the flatness, because the wall or a structure may cause warping. – After installing three or more ASSY BRACKETs, put a spare ASSY Flatness measurement positions: Around areas where screws are fastened BRACKET horizontally and measure the height difference.
  • Page 29 3. Frame Installation Samsung Electronics ※ Frame Kit product can be installed by extending the size as required. - Components can be extended horizontally or vertically for installation. - When installing ASSY BRACKET JIGs for fixing the joints between ASSY BRACKETs, make sure two persons work together so that the ASSY BRACKET JIGs can be fixed properly.
  • Page 30 3. Frame Installation Samsung Electronics ※ Vertical frame extension - Attach the Joint V (vertical) to the target frame for extension - Insert the joints of the additional frame into the existing frame. Insert jigs to place the frames into position.
  • Page 31 4. Cabinet + Frame Installation Samsung Electronics ◇ Fixing of I/G position ① Attach the I/G on the rear of each cabinet by type, first. (See Fig.1.) ※ Installation position: Place the I/G at a spot 35–40 mm below the engraving on the right-side frame, and fasten the screws (Fig.2).
  • Page 32 4. Cabinet + Frame Installation Samsung Electronics ② Draw the cabinet right up against the frames by aligning the cabinet corners with the engravings on the frames. ※ For the order of installing cabinets, see Fig. 1 on page 22 .
  • Page 33 5. Cabinet + Frame Installation Samsung Electronics ⑤ When modules are tightly coupled , it becomes difficult in detaching a module. Accordingly, sample some modules during installation to check whether module ★Important detachment is possible. ※ Otherwise, it may cause maintenance issues due to difficulty in attachment and detachment of a module.
  • Page 34 4. Cabinet + Frame Installation Samsung Electronics ◇ PIVOT installation When installing the PIVOT, use the PIVOT-specific Frame Kit. (VG-LFR51PWL / the same installation steps apply) ① Check that the BOLT ETCs are fastened. (Fig.1) ② Fasten the BOLT ETCs again appropriately for PIVOT installation. Fasten two additional bolts and remove the COVER HANDLEs.
  • Page 35 5. S-Box Installation and Connection Samsung Electronics • Precautions for installing S-Box ① Installing it in a 19-inch server rack is recommended. ※ When connecting two or more sets for Multi-link HDR, install them in the six-sided shield rack. (Only SBB-SNOWJMU) ②...
  • Page 36 5. S-Box Installation and Connection Samsung Electronics • S-Box connection ① Send visual signal input into the S-Box (input ports: HDMI, DP). ② Use the SOURCE STATUS to check the signal input (Red: HDMI1, Green: HDMI2, Blue: DISPLAY PORT). ③ Use the LAN cable to connect the HDBT OUT port on the S-Box to the HDBT IN port on the Interface Gender.
  • Page 37 5. S-Box Installation and Connection Samsung Electronics ⑧ Cable recommendations for HDBaseT ★ ★ Orderly Rolled (Recommend) Random Rolled (Not Recommend)  Do not use “comb” or “pinstripe” type cables.  Use HDBaseT cables that are 15 m to 100 m long.
  • Page 38 5. S-Box Installation and Connection Samsung Electronics ⑧ HDBaseT cable  EMI sources: Ensure that the product is placed away from the electromagnetic environment (e.g. high-voltage wires, electric motor-based equipment such as an elevator or refrigerator, fluorescent lights, lighting fixture).
  • Page 39 5. S-Box Installation and Connection Samsung Electronics ⑨ Finishing the HDBaseT cable after installation  Using shielded STP RJ45: Use a shielded RJ45 connector, and a CAT 6 or CAT 7 connector using a plastic load bar. Load bar  Insertion of conductors (conducting wires) into plastic loader: Insert conducting wires into the RJ45 connector, as shown by the conducting wire structure (T-568B) in the following figure.
  • Page 40 5. S-Box Installation and Connection Samsung Electronics ⑩ Finishing the HDBaseT cable after installation  Pushing in of plastic loader to fullest extent: Push the plastic load bar as close as possible to the cable.  Use a wire stripper to cut all conductors (conducting wires) down to a length of about 0.5 inches.
  • Page 41 5. S-Box Installation and Connection Samsung Electronics ⑩ Finishing the HDBaseT cable after installation  Fold and raise the drain wire above the RJ-45 connector. Use pliers to attach the deformation prevention parts together, as shown below.  Soldering of drain wire to metallic part of RJ45 connector: Solder the drain wire to the metallic part of the RJ45 connector and cut unnecessary parts out.
  • Page 42 5. S-Box Installation and Connection Samsung Electronics • S-Box Connection (Redundancy) ① If a redundancy feature is required Use the OCM cable to connect the DATA IN port on the Interface Gender to the DATA OUT port on the last cabinet.
  • Page 43 5. S-Box Installation and Connection Samsung Electronics • S-Box Connection (External IR Receiver) ※ Only one external IR receiver is provided for a set. - External IR receiver can be connected to the S-Box body or Interface Gender card (I/G card).
  • Page 44 5. S-Box Installation and Connection Samsung Electronics • S-Box Connection (Panel Configuration) ① Initial S-Box picture quality settings • S-Box is delivered with default picture quality settings optimized for the IWJ cabinet. • After an LED display is installed, the picture quality settings become automatically optimized for the installed LED display model.
  • Page 45 5. S-Box Installation and Connection Samsung Electronics • S-Box connection (Grouping) Press the Home button on the remote control and set Video Wall to “On” [Precautions] Prior to running S-Box Grouping from LSM (LED Signage Manager), make sure you set the resolution for the input source device to a resolution compatible with S-Box Grouping.
  • Page 46 5. S-Box Installation and Connection Samsung Electronics ③ Changing the PC output frequency  Right-click with the mouse on the computer desktop and click “Screen Resolution” → “Advanced settings.”  Click the “Monitor” tab and select “60 Hertz” from the “Screen refresh rate” dropdown box under “Monitor...
  • Page 47 5. S-Box Installation and Connection Samsung Electronics ④ Frequencies compatible with S-Box Grouping (1/2) Resolution Horizontal frequency Vertical frequency Clock frequency Polarity S-Box Grouping (KHz) (KHz) (MHz) Horizontal / Vertical...
  • Page 48 5. S-Box Installation and Connection Samsung Electronics ④ Frequencies compatible with S-box Grouping (2/2)
  • Page 49 5. S-Box Installation and Connection Samsung Electronics ⑤ Picture settings  To use S-Box Grouping, make sure both the Dynamic Contrast and Black Tone functions are off so as to minimize a picture quality difference between S-Boxes.  Menu→ Picture → Advanced Settings, - Dynamic Contrast: default “Medium”...
  • Page 50 5. S-Box Installation and Connection Samsung Electronics • S-BOX Connection (Service Port) ① The Service port is a dedicated monitoring port used to access the OSD menu during initial installation of an S-Box and check the playback status of a source device.
  • Page 51 5. S-Box Installation and Connection Samsung Electronics • Simple wall mode  This mode is used to easily display a wallpaper when you do not want the product to display a blank screen while not in use.  If the screen resolution is smaller than the S-Box output resolution, use the Factory Menu to turn on the Simple wall mode.
  • Page 52 S-BOX Installation and Connection Samsung Electronics (Only SBB-SNOWJMU model) • How to install when use Multi Link HDR function  Product recommend installing this product in a standard 19-inch server rack, please refer 25 page about basic installation guide. ① Please open rubber plug of Multi Link HDR port.
  • Page 53 S-BOX Installation and Connection Samsung Electronics (Only SBB-SNOWJMU model) • Multi Link HDR Cable  Use the appropriate cable according to the quantity of S-BOX connected. Multi Link HDR Port Multi Link HDR Port...
  • Page 54 S-BOX Installation and Connection Samsung Electronics (Only SBB-SNOWJMU model) • FPGA Update Guide when using Multi Link HDR Cable ※ Note : Before update, disconnect the Multi Link HDR Cable from S-BOX.  Factory update method  LSM update method Multi Link HDR Port ①...
  • Page 55 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • How to download LSM: Access GSBN, select SLM - Display solution download, and then select "LED SIGNAGE MANAGER" or "LSM“ - GSBN: http://v3.samsunggsbn.com/ep...
  • Page 56 Network IP Setting Tool Use the File Explorer to go to the folder where LSM is installed. Select [Start] – Programs – Samsung – LED Signage Manager – Network Configuration. Use the RS232C cable to connect the PC to the S-Box. Select the connected Serial port and press the Open button to establish a connection.
  • Page 57 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Software for remote control of LED cabinet layout Ethernet S-Box Connect the PC to the S-Box via Ethernet. HDBT Control PC Use a LAN cable to connect the S-Box to the Interface Gender.
  • Page 58 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Start– Login Page When the LSM is launched for the first time, the password setting page appears. To set a password, enter the same password of your choice twice and click the Start button.
  • Page 59 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • New Connection To add connection information, use the Search button to search for an IP address or manually enter an IP address. If you click the Search button, the IP address for LSBs available for connection on the same network appear.
  • Page 60 6. Settings / How to Use Samsung Electronics [★ Caution!] When configuring LED cabinet network settings, it is recommended that 9-1. PC-specific control software a static IP address be used. If DHCP is used and the IP address is changed, the connection with LSM may be disconnected.
  • Page 61 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) [★ Caution!] For internal communication between the S-Box and LED cabinets, use ports 1515 and 48485. When firewalls / security network are in use, make sure the corresponding port between the S-Box and LED cabinets is enabled.
  • Page 62 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Home Window INPUT SOURCE: Shows the LSB input source, resolution and connection duration. LAYOUT: Shows the layout and quantity of all LED cabinets and the quantities of connected and disconnected cabinets.
  • Page 63 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Edit Connection Layout Window Connection layout: Use the LSB output source section to adjust the LED cabinet layout by rearranging cabinets. Feature View: Provides the Edit button used to edit connection information and the automatic LED cabinet alignment function.
  • Page 64 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window Device connection list view: View LSB configuration information. Edit or delete LSB connections. View LED cabinets by group. Connection layout (View Port):...
  • Page 65 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Device Information/Setting View 1. Basic : . Turn on/off the S-Box. Change the input source. Mute or free the screen.
  • Page 66 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Device Information/Setting View 6. Cabinet Settings . Turn on/off ABL, and set Gamut and Backlight. . Use the software update function (e.g. FPGA, module calibration data).
  • Page 67 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Sub Information View Monitor Window: View MDC communication logs and information about connected devices. Extract data by using files.
  • Page 68 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Main Window - Preference Options Set the command retry count. Set the error status checking interval. Set the temperature alert threshold. Support Select a language.
  • Page 69 6. Settings / How to Use Samsung Electronics 9-1. PC-specific control software LSM (LED Signage Manager) • Dehumidification Mode using LSM The dehumidification mode icon is provided under the S-Box menu. To turn on dehumidification mode, click the icon. It is possible to view how long the dehumidification has been on.
  • Page 70 7. Settings / How to Use Samsung Electronics 7. Control Program for PC LSM(LED Signage Manager) • Mixed use for IER and IER-F ※ IER and IER-F can be connected to the same port. There is no connection order for IER and IER-F.
  • Page 71 • Make sure the quantity of connected cabinets does not exceed the recommended quantity. If the recommended quantity is exceeded, the breaker may trip or the product may become damaged due to over-current. ※ Samsung Electronics is not responsible for problems caused as a result of exceeding the recommended quantity of connections.
  • Page 72 • Make sure the quantity of connected cabinets does not exceed the recommended quantity. If the recommended quantity is exceeded, the breaker may trip or the product may become damaged due to over-current. ※ Samsung Electronics is not responsible for problems caused as a result of exceeding the recommended quantity of connections.
  • Page 73 8. Power and Cable Connection Samsung Electronics 8-2. Precautions during cabinet installation and cable connection (Full Front fixing) 1) If cabinets are installed on a dedicated wall mount, the cabinets are fastened toward the bottom-left direction. Sets can only be installed in the left-to-right direction.
  • Page 74 8. Power and Cable Connection Samsung Electronics 8-3. Cabinet installation direction (Full Front fixing) 1) For the lowest row, install cabinets in the left-to-right direction. 2) After installing one row of sets is completed, connect signal and power cables between the cabinets.
  • Page 75 8. Power and Cable Connection Samsung Electronics 8-4. Cable connection After installation and connection, automatic sorting can be made on LSM. (automatic sorting for cabinets) It is recommended to install the cabinets in automatic sorting order.
  • Page 76 8. Power and Cable Connection Samsung Electronics Ex ) 8-4. Cable connection FHD 50/60 Hz screen with IER/IFR would be : 4x4 for P2.0 / 5x5 for P2.5 / 8x8 for P4.0 Case 1: Reverse Forward...
  • Page 77 8. Power and Cable Connection Samsung Electronics Ex ) 8-4. Cable connection FHD 50/60 Hz screen with IER-F/IFR-F would be : 16x4 for P2.0 / 20x5 for P2.5 / 32x8 for P4.0 (recommended to install mixed with IER/IFR) Case 2:...
  • Page 78 9. Seam Adjustment Samsung Electronics ◇ Checking and adjusting seam ① On the white screen, check that there is no black line found between cabinets. (See Fig.1.) ② Check for a gap or significant height difference between modules. (See Fig.2.) ※...
  • Page 79 9. Seam Adjustment Samsung Electronics ◇ Module disassembly/reassembly Hold the JIG with the UNLOCK marking facing up. Put the JIG to the LED module. Separate the JIG and the module together. Hold the JIG with the LOCK marking facing up. Put the JIG to the LED module to lock the module.
  • Page 80 Samsung Electronics IER-F/IFR-F series Installation Manual LH0**IER*F* LH0**IFR*F*...
  • Page 81 Table of Contents Samsung Electronics 0. Product Information 1. Frame Kit & JIG Configuration 2. IER(IFR) Landscape Installation + IER-F(IFR-F) Extension 2-1. IER + IER-F Extension (Left to Right) 2-2. IER + IER-F Extension (Up to Down) 2-3. IER-F + IER-F Extension (Left to Right) 2-4.
  • Page 82 0. Product Information Samsung Electronics ◇ Components of the Frame Kit ◇ Cabinet product information / Gap to the Frame (only for installation of IER-F) Code Installation Remarks Layout VG-LFR13SWL FRAME F (3 Set) VG-LFR11SWL FRAME F (1 Set) FRAME F...
  • Page 83 0. Product Information Samsung Electronics ◇ IER-F accessories Product Warranty Card Quick Setup Guide Specification Power Cord (Not provided in some regions) Machine Screws (M4*L10, 13 EA) Extension Power Cable OCM Cable PET Tape (W10*L540,1 EA) COVER PCB (4ea) COVER PCB (6ea)
  • Page 84 1. Frame Kit & JIG Configuration Samsung Electronics • Check the following items in each package. Frame F Lv3 Frame F Lv1 Frame F PIVOT VG-LFR13SWL VG-LFR11SWL VG-LFR11PWF Item Quantity 1x1 PIVOT ⓐ ASSY BRACKET SIDE ⓑ JOINT V ⓒ...
  • Page 85 1. Frame Kit & JIG Configuration Samsung Electronics • Check the following items in each package. JIG F JIG F PIVOT CY-LJRNEF CY-LJRNPF Item ⓒ ⓑ ⓓ ⓔ Quantity ⓐ ⓑ STUD - PEM ⓒ L SUPPORT L SUPPORT D-TOOL STUD PEM ⓓ...
  • Page 86 2. IER Landscape Installation + IER-F Extension Samsung Electronics • For installation of IER-F, use 1 x 1 Frame (VG-LFR11SWL) and use the JIG hole gap different from that of IER. (IER: 270 mm / IER-F: 240 mm) • As in the following figure, use the JIG F (NEW) for ①, ③, and ④ and use the previous JIG (included in VG-LFR84FWL, VG-LFR5 3FWL, and VG-LFR52SWL) for ②.
  • Page 87 2. IER Landscape Installation + IER-F Extension Samsung Electronics • The JIG F needs 3 different gaps between IER and IER-F, between IER-F cabinets, and between IER-Fs. • In the place with a Stud hole, mount the IER Frame. In the place with two Stud holes, mount the IER-F Frame.
  • Page 88 2. General Installation of IER + IER-F Extension Frame F Samsung Electronics • There are two types of Frame Kits (LV1 & LV3) for installation of IER-F Landscape (Fig 4). • Different from the IER Frame, be careful upon installation because the Frame F has no direction for left and right.
  • Page 89 2-1. IER + IER-F Extension (Left to Right) Samsung Electronics • Use the JIG F when installing the IER-F (“F”) left to right on the installed IER Frame. ① • Fasten an IER Frame Side and two Frame Fs on the JIG.
  • Page 90 2-2. IER + IER-F Extension (Up to Down) Samsung Electronics • When F is installed horizontally on the installed IER Frame, use the default JIG of IER (included in VG-LFR84FWL, VG-LFR53FWL, and VG-LFR52SWL). • The Stud location of the default JIG must be adjusted (FIG 9).
  • Page 91 2-3. IER-F + IER-F Extension (Left to Right) Samsung Electronics • Use the JIG F when installing the F left to right on the installed Frame F. • Fasten a Frame F and two Frame Fs on the JIG. ③...
  • Page 92 2-4. IER + IER-F Extension (Up to Down) Samsung Electronics • Like the vertical extension of the IER Frame, use the Joint V and for this purpose, change the Stud location of the JIG F. • However, in this case, the frames may not be aligned vertically. Accordingly, the vertical and horizontal checks mandatory.
  • Page 93 2-5. IER-F + IER-F L-Type Installation Samsung Electronics • When there is any L-type installation, install the L-type Frame Kit first of all. • For L-type installation, use two JIG Fs (CY-LJRNEF). • Align the fastened Stud with the L Support and then fasten JIG screws. (Fig 17) •...
  • Page 94 2-5. IER-F + IER-F L-Type Installation Samsung Electronics • When the Frame F Lv3 is used, repeat JIG fastening and screw fastening from top to bottom. • After fastening the Frame F to the wall with screws, for detaching the JIG F from the Frame F, •...
  • Page 95 2-5. IER-F + IER-F L-Type Installation Samsung Electronics Cabinet Installation • For IER-F L-type installation, use only two among four BOLT ETCs and remove the BOLT-ETCs not in use. (Fig. 21) • In the joint where two cabinets are met (L-type corner), do not use the BOLT ETC but the outer BOLT-ETC. (Fig. 22) •...
  • Page 96 2-5. IER-F + IER-F L-Type Installation Samsung Electronics Cabinet Installation • During L-type installation, a module covers another one. This direction can be determined, noting the L Support mark while installing the Frame Kit. Module overlapping direction from the current JIG point of...
  • Page 97 2-5. IER-F + IER-F L-Type Installation Samsung Electronics Cabinet Installation • Mount IER-F Cabinets one by one. • Remove two (Up and Down) of three modules. • Assemble the Bracket Link and fasten it with screws through the hole in the L-shaped corner where the module has been removed.
  • Page 98 2-5. IER-F + IER-F L-Type Installation Samsung Electronics BRACKET-LINK • Remove the Insulator Sheet attached to the Bracket Link’s assembly part of the Cover Rear. • Check the Bracket Link assembly marks to make sure that the TOP is assembled with the TOP and the BTM with the BTM.
  • Page 99 2-5. IER-F + IER-F L-Type Installation Samsung Electronics BRACKET-ALIGN • When IER-Fs are stacked upward, fasten the Bracket Align that is used to compensate for Z-axis difference between top and bottom cabinets. • Remove the bottom module from the upper cabinet and the top module from the lower cabinet.
  • Page 100 3. [PIVOT] IER + IER-F Extension Samsung Electronics • During installation of IER Pivot, install the IER-F with the JIG F Pivot (CY-LJRNPF). IER PIVOT FRAME <Frame Kit for Installation of IER-F Pivot> ① ② IER-FRAME F PIVOT • A: Frame gap for extension of IER-Fs (Left to Right) ③...
  • Page 101 3. [PIVOT] IER + IER-F Extension Samsung Electronics • When installing the IER Pivot, install the Cabinet by turning it clockwise (from Front view). -> Install it by turning the arrow on the rear to be upward. • For installation of IER-F, use the Frame F Pivot...
  • Page 102 3-1. [Pivot] IER + IER-F Extension (Up to Down) Samsung Electronics • Fasten an IER Pivot Frame and two Frame F Pivots on the JIG. • Align the JIG Stud with the JIG hole of the Frame. • Fasten the Frame F Pivot to the wall with screws.
  • Page 103 3-2. [Pivot] IER-F + IER-F Extension (Left to Right) Samsung Electronics • Fasten the installed Frame F Pivot and two Frame F Pivots to install on the JIG. • Align the JIG Stud with the JIG hole of the Frame. (without using the JIG screws) •...
  • Page 104 3-3. [Pivot] IER-F + IER-F Extension (Up to Down) Samsung Electronics • Fasten the installed Frame F Pivot and two Frame F Pivots to install on the JIG. • Align the JIG Stud with the JIG hole of the Frame. (without using the JIG screws) ③...
  • Page 105 4. Fastening the Cover PCB Samsung Electronics • After IER + IER-F Cabinet installation, fasten the Cover PCB to the outermost edge to fix the Module. • You can fasten two Cover PCBs on the horizontal side and a Cover PCB on the vertical side based on a module.

This manual is also suitable for:

Ifr seriesIer-f seriesIfr-f seriesLh0 ier seriesLh0 ifr seriesLh020ier ls series ... Show all

Table of Contents