Samsung IER Series Installation Manual
Samsung IER Series Installation Manual

Samsung IER Series Installation Manual

Led display
Hide thumbs Also See for IER Series:

Advertisement

LED Display
Installation Manual
Ver. 4.2
IER / IER-F / IFR /IFR-F Series
LH0**IER*LS , LH0**IER*FS
LH0**IFR*LS , LH0**IFR*FS
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

Summary of Contents for Samsung IER Series

  • Page 1 LED Display Installation Manual Ver. 4.2 IER / IER-F / IFR /IFR-F Series LH0**IER*LS , LH0**IER*FS LH0**IFR*LS , LH0**IFR*FS LED R&D Lab(VD)
  • Page 2 Revision History Version Date (Y/M/D) Description 2020/03/20 New Release 2020/06/22 Add SNOW-1810U installation and picture setting 2020/08/07 Add test pattern function 2020/08/21 Adjust Power consumption info and Table of contents + Appendix 2020/09/04 Add the luminance function of the operation for the mixed connections 2020/11/02 Modify dehumidification mode 2020/11/16...
  • Page 3 ∙ Case when vacuum packaging is already unsealed before unpacking products. ∙ Case when environment condition is worse than Samsung working condition (0°C~40°C/10~80%RH). ∙ Case when it elapses longer than 7 days after unpacking them, even though the environment condition satisfies Samsung working condition (0°C~40°C/10~80%RH).
  • Page 4 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during installation  How to install the screen in the case that dehumidification is necessary ※ Before finishing the directions explained in next pages, never play other contents or use them. ※...
  • Page 5 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during installation  How to install the screen in the case that dehumidification is necessary. 3. While installing cabinets, S-Box should play only this pattern. •...
  • Page 6 This information should be noticed to customer. Dehumidification guidance Please print this page and hand it to user. – during operation • Electrical short in package is possible to happen during products are working. • For keeping quality of products during installation, please refer below cautions. –...
  • Page 7 This information should be noticed to customer. Please print this page and hand it to user. Dew condensation due to overcooling  Even though meet with Samsung recommended operation condition, dew condensation is possible to happen when surface of products is colder than environment temperature or hot &...
  • Page 8 This information should be noticed to customer. Please print this page and hand it to user. Prevent condensation due to A/C  Make sure that the cold air does not blow directly on the screen. – When the cold air from A/C (air conditioner) blows directly onto the screen surface, condensation may occur depending on the ambient humidity and temperature of screen surface.
  • Page 9 Guidance of latest firmware • When install products, please update latest firmware on online - You can download latest firmware from SLM site.  URL of SLM Page : https://www.secslm.com  After login Help Download Center에서 Download  Before you download firmware, you MUST check same firmware of model (marked red letter in below) &...
  • Page 10: Table Of Contents

    Table of Contents 1. Product Information and Installation Precautions (P.7) 2. Preparation for Cabinet Installation (P.18) 3. Frame Kit (P.22) 4. Frame Installation (P.23) 5. Cabinet + Frame Installation (P.31) 6. S-Box Installation and Connection (P.35) 7. Settings / How to Use (P.54) 8.
  • Page 11: Product Information And Installation Precautions

    1. Product Information and Installation Precautions ◆ Model Line-up Installation This Manual is an Manual for IER/IFR , which contains information of (Appendix. IER-F/IFR-F) models below (Installation process is same for each pitch model) Installation Table Models Product Appearance and Information of Contents IER/IFR series See pages 2 to 76...
  • Page 12 1. Product Information and Installation Precautions ◆ Model specification IER / IFR IER-F / IFR-F Spec. P1.5 P2.0 P2.5 P4.0 P1.5 P2.0 P2.5 P4.0 Width Size (mm) height Ver. Resolution Hor. Number of 4 x 3, 12ea 1 x 3, 3ea Module Weight IER : 10.8kg...
  • Page 13 1. Product Information and Installation Precautions IER-F / IFR-F ※ Please refer to Appendix for information of Frame Kit ◆ Frame Kits configuration (See page 22.) Frame kit Configuration Remarks for installation VG-LFR84FWL (32 sets) VG-LFR53FWL (15 sets) VG-LFR52SWL (10 sets) VG-LFR51PWL 5*1 P (15 sets)
  • Page 14 1. Product Information and Installation Precautions ◆ Installation precautions (LED damage) Precautions Images [Be careful of external impact or dropping] ① After removing the Cover-Corner from the product prior to installation, MODULE exercise caution to ensure that the LED surface is not exposed to physical Front impact and the product is not dropped onto the floor.
  • Page 15  Requirements for indoor installation ※ ADA: Americans with Disabilities Act - Applicable to use of SAMSUNG wall mount (compliant with ADA) ∙ Gap between the product front and the wall: 99.5 mm ∙ Gap between the product rear and the wall: 35.5 mm 99.5 mm...
  • Page 16 1. Product Information and Installation Precautions  Fan flow rate depending on the number of installed cabinet rows ※ CFM = cubic feet per minute ※ Measurement based on one column No. of rows 1 to 3 4 Rows 5 Rows 6 Rows 7 Rows 8 Rows...
  • Page 17 1. Product Information and Installation Precautions  Vent requirements • Requirements for using FAN – Air vent: Should only be installed on the bottom - Use vents with an opening rate of at least 70% – Upper portion: Seal the entirety, except the fan outlets ����...
  • Page 18 1. Product Information and Installation Precautions  Minimum spacing for wall mounting installation Min condition : 30mm (set ~ ceiling) Recommended condition : more than 500mm Air vent area (more than 60% Air vent area of opening rate) Min condition: 30mm (set ~ floor) Air vent area (more than 60% Recommended condition : more than 500mm...
  • Page 19 1. Product Information and Installation Precautions  Minimum spacing for processed installation Min condition : 0mm (set ~ ceiling) Recommended condition : more than 500mm Air vent area Essential cond. : more than 30mm of 100% opening rate Essential cond. : more than 30mm of 100% opening rate Min condition: 0mm (set ~ floor) Air vent area Recommended condition : more than 500mm...
  • Page 20 1. Product Information and Installation Precautions  Example of minimum spacing and FAN allocation for wall mounting installation Min condition : 30mm (set ~ ceiling) Recommended condition : more than 500mm Other parts except for FAN area should be sealed left and right should be sealed left and right sealing Air vent area should be mesh type with...
  • Page 21 1. Product Information and Installation Precautions  Example of minimum spacing and fan allocation for recessed installation Min condition: 0mm (set ~ ceiling) Recommended condition : 500mm Essential cond. : more than 30mm of 100% opening rate Other parts except for FAN area should be sealed left and right should be sealed.
  • Page 22 1. Product Information and Installation Precautions  Example of minimum spacing and placement during rear exhaust Ambient temperature on the back of the wall should be less than 30 ℃. Other parts except for FAN should be sealed. left and right should be sealed. Air vent area Essential cond.
  • Page 23 1. Product Information and Installation Precautions ◆ Preparation for installation LED MODULE JIG Phillips (+) Electric screwdriver (model name: CY-LJRNLS) screwdriver ※ Recommended sizes Service JIG Holder Magnet Tool Pliers Anti-static (BH81-00001A) (Included in LED MODULE JIG) gloves LED R&D Lab(VD)
  • Page 24 1. Product Information and Installation Precautions ◆ IER (IFR) Accessory configuration IER / IFR Common Product Warranty Card STUD PEM Quick Setup Guide regulation guide (Not provided in some regions) (guide pin,2ea) IER-F / IFR-F Extension Power Cable OCM Cable PET Tape (W10*L540,1 EA) COVER PCB (6ea)
  • Page 25: Preparation For Cabinet Installation

    2. Preparation for Cabinet Installation ◆ Preparation for installation ① Remove the tape on top of the package box and open the box. (See Fig.1.) ② Remove the Top–Cushion and open the shielding bag. Hold the handles inside, take out the set, and then remove the PE bag. (See Fig.2.) ③...
  • Page 26 2. Preparation for Cabinet Installation ◆ Preparation for installation ④ Connect the power and check for a problem with the screen. (See Fig.4.) ※ See page 12 for details on how to check for a screen problem. ⑤ Guide Pin (Accessory Enclosed) 2EA is assembled on top of the cabinet. (Excluding the capinet on the top row) ⑥Unfasten the screws (four screws in total) and remove the corner covers.
  • Page 27 2. Preparation for Cabinet Installation ◆ Note: Checking for a screen problem ⑥ Connect the power cord that came with the product and turn on the product. Check that there is no LED damage and no problem is found on the screen. Power In Switch (Toggle) Power out...
  • Page 28 2. Preparation for Cabinet Installation ⑧ For cabinets placed on the edge, attach PET sheet before attaching PCB covers. ※ Attach PET sheet to all borders of the LED module (Fig.1), and attach PCB covers to the same outer sides where the PET sheet has been attached (horizontally 5 points and vertically 4 points, as shown by the blue borders in Fig.2).
  • Page 29: Frame Kit

    3. Frame kit Components ① Check the configuration below in the frame kit. ※ Refer to the attached specifications for the IER-F/IFR-F installation. LFR84FWL LFR53FWL LFR52SWL LFR11SWL LFR51PWL Qty (+spares) Item PIVOT ASSY BRACKET SIDE ⓐ ASSY BRACKET MIDDLE ⓑ ASSY BRACKET CENTER 1 (+1) 1 (+1)
  • Page 30: Frame Installation

    4. Frame Installation ② On the left end, place the ⓐBracket Side and fasten the screws to install the Bracket (Fig.3). ※ Fasten one screw first, and use a clinometer to vertically align the right edges and fasten screws into the other holes. (See the next page for precautions when fastening screws.) Fasten the screws in the order of screw 1 →...
  • Page 31 Standard wood stud interval of 16” is supported. (24” is plaster board thickness) not supported.) Samsung Electronics is not responsible for problems caused as a result of failure to follow the requirements specified in the installation guide. LED R&D Lab(VD)
  • Page 32 4. Frame Installation Install the ⓑ Bracket Middle. ③ Incorrect Correct installation installation ※ First, check the holes into which to fix the ⓓ JIGs. (See Fig.1.) Wall ※ Next, align the ⓓ JIG with the bracket holes and fasten the four screws. (See Fig.2.) ⓐ,ⓑ,ⓒ...
  • Page 33 4. Frame Installation ⑤ After installing the Bracket Center, install the lowest row cabinets. (See Fig.6.) ⑥ After installing the cabinets, push the LED modules toward the middle and check the height difference between the cabinets on both ends and the LED modules. (See Fig.7.) ◆Bracket Center’s usable section, ⑦...
  • Page 34 4. Frame Installation– Adjusting the Frame Center (Important) ◆Bracket Center’s usable section, • Install the Frame Center after a Frame Side and two Frame Middles are installed based on the VG-LFR53FWL. VG-LFR53FWL: Every 3 rows • Before installing Frame Middle next to the Frame Center, be sure to hang the IER Cabinet on the bottom line.
  • Page 35 4. Frame Installation If installing three or more ASSY BRACKETs, adjust the flatness, because the wall or a ※ structure may cause warping. – After installing three or more ASSY BRACKETs, put a spare ASSY BRACKET horizontally and measure the height difference. If a height difference is found, adjust the Z-Bolts of the ASSY BRACKETs to adjust the flatness.
  • Page 36 4. Frame Installation ※ The Frame Kit product can be installed by extending the size as required. - Components can be extended horizontally or vertically for installation. - When installing ASSY BRACKET JIGs for fixing the joints between ASSY BRACKETs, make sure two persons work together so that the ASSY BRACKET JIGs can be fixed properly.
  • Page 37 4. Frame Installation ※ Vertical frame extension - Insert the joints of the additional frame into the existing frame. Insert jigs - Attach the Joint V (vertical) to the target frame for extension to place the frames into position. - After attaching the jigs, fasten screws between the frames. Fasten M4 M4 screw 1 mm...
  • Page 38: Cabinet + Frame Installation

    5. Cabinet + Frame Installation ◆ Fixing of I/G position ① Attach the I/G on the rear of each cabinet by type, first. (See Fig.1.) ※ Installation position: Place the I/G at a spot 35–40 mm below the engraving on the right-side frame, and fasten the screws (Fig.2). 70–80 mm 35–40 mm Fig2.
  • Page 39 5. Cabinet + Frame Installation ◆ Fixing of I/G position ② Draw the cabinet right up against the frames by aligning the cabinet corners with the engravings on the frames. ※ For the order of installing cabinets, see Fig. 1 on page 18 . ※...
  • Page 40 5. Cabinet + Frame Installation ◆ Fixing of I/G position ⑤ When modules are tightly coupled , it becomes difficult in detaching a module. Accordingly, sample some modules during installation to check whether module ★Important detachment is possible. ※ Otherwise, it may cause maintenance issues due to difficulty in attachment and detachment of a module. Excessive action may cause damage to the module.
  • Page 41 5. Cabinet + Frame Installation ◆ PIVOT installation When installing the PIVOT, use the PIVOT-specific Frame Kit. (VG-LFR51PWL / the same installation steps apply) ① Check that the BOLT ETCs are fastened. (Fig.1) ② Fasten the BOLT ETCs again appropriately for PIVOT installation. Fasten two additional bolts and remove the COVER HANDLEs.
  • Page 42 5. Cabinet + Frame Installation ◇ Installation Guide of recessed screen  When installing recessed screen, minimal work space is needed from the edge of the screen. – In order to finish seam adjustment, fixation parts should be installed on the screen edge. If the parts are not installed, seam between modules could be made.
  • Page 43 5. Cabinet + Frame Installation ◇ Installation Guide of recessed screen  Work space should be finished with detachable material for service. – Work space more than 1mm should be secured for safety of the screen. Be cautious of safety of the screen while detaching and attaching finishing material. –...
  • Page 44: S-Box Installation And Connection

    SBB-SNOWJAU / SBB-SNOWJMU 6. S-Box Installation and Connection • Precautions for installing S-Box Installing it in a 19-inch server rack is recommended. ① ※ When connecting two or more times for the purpose of using multi-link HDR, install it on the ground shielded rack and use it. (SBB- SNOWJMU model) Make sure the air vent is open and not overturned or turned sideways.
  • Page 45 6. S-Box Installation and Connection • S-Box connection ① Send visual signal input into the S-Box (input ports: HDMI, DP). ② Use the SOURCE STATUS to check the signal input (Red: HDMI1, Green: HDMI2, Blue: DISPLAY PORT). ③ Use the LAN cable to connect the HDBT OUT port on the S-Box to the HDBT IN port on the Interface Gender. ④...
  • Page 46 6. S-Box Installation and Connection Orderly Rolled (Recommend) Random Rolled • S-Box connection ★ ★ (Not Recommend) ⑧ Cable recommendations for HDBaseT  Do not use “comb” or “pinstripe” type cables.  Use HDBaseT cables that are 15 m to 100 m long. ...
  • Page 47 6. S-Box Installation and Connection • S-Box connection ⑨ Finishing the HDBaseT cable after installation  Using shielded STP RJ45: Use a shielded RJ45 connector, and a CAT 6 or CAT 7 connector using a plastic load bar. Load bar ...
  • Page 48 6. S-Box Installation and Connection • S-Box connection ⑩ Finishing the HDBaseT cable after installation • Pushing in of plastic loader to fullest extent: Push the plastic load bar as close as possible to the cable. • Use a wire stripper to cut all conductors (conducting wires) down to a length of about 0.5 inches. •...
  • Page 49 6. S-Box Installation and Connection • S-Box connection ⑩ Finishing the HDBaseT cable after installation • Fold and raise the drain wire above the RJ-45 connector. Use pliers to attach the deformation prevention parts together, as shown below. • Soldering of drain wire to metallic part of RJ45 connector: Solder the drain wire to the metallic part of the RJ45 connector and cut unnecessary parts out.
  • Page 50 6. S-Box Installation and Connection • S-Box connection (Redundancy) ① If a redundancy feature is required Use the OCM cable to connect the DATA IN port on the Interface Gender to the DATA OUT port on the last cabinet. SNOW-1801U •...
  • Page 51 6. S-Box Installation and Connection • S-Box connection (External IR Receiver) ※ Only one external IR receiver is provided for a set. - External IR receiver can be connected to the S-Box body or Interface Gender card (I/G card). ※ When connected to the I/G card, make sure “Network Standby” is set to “On” in System - Power Control. LED R&D Lab(VD)
  • Page 52 6. S-Box Installation and Connection • S-Box connection (Panel configuration) ① Initial S-Box picture quality settings • S-Box is delivered with default picture quality settings optimized for the IWJ cabinet. • After an LED display is installed, the picture quality settings become automatically optimized for the installed LED display model. •...
  • Page 53 6. S-Box Installation and Connection • S-Box connection (Panel configuration) ② S-BOX 연결 (Grouping) Press the Home button on the remote control and set Video Wall to “On” [Precautions] Prior to running S-Box Grouping from LSM (LED Signage Manager), make sure you set the resolution for the input source device to a resolution compatible with S-Box Grouping.
  • Page 54 6. S-Box Installation and Connection • S-Box connection (Panel configuration) ③ Changing the PC output frequency • Right-click with the mouse on the computer desktop and click “Screen Resolution” → “Advanced settings.” • Click the “Monitor” tab and select “60 Hertz” from the “Screen refresh rate” dropdown box under “Monitor Settings.” LED R&D Lab(VD)
  • Page 55 6. S-Box Installation and Connection ④ Frequencies compatible with S-Box Grouping (1/2) Resolution Horizontal frequency Vertical frequency Clock frequency Polarity S-Box Grouping (KHz) (KHz) (MHz) Horizontal / Vertical LED R&D Lab(VD)
  • Page 56 6. S-Box Installation and Connection ④ Frequencies compatible with S-box Grouping (2/2) LED R&D Lab(VD)
  • Page 57 SBB-SNOWJAU / SBB-SNOWJMU 6. S-Box Installation and Connection • S-BOX Connection (Panel configuration) ⑤ Picture menu setting • When using S-Box grouping, you must set Picture mode to Calibration. Calibration mode deactivates Contrast Enhancer, Black Tone, Auto Motion plus function so that there is no screen difference between S-Box. •...
  • Page 58 6. S-Box Installation and Connection • S-BOX Connection (Service Port) The Service port is a dedicated monitoring port used to access the OSD menu during initial installation of an S-Box and ① check the playback status of a source device. The resolution for the Service port is FHD (1920*1080 @ 60 Hz).
  • Page 59 6. S-Box Installation and Connection • Simple wall mode  This mode is used to easily display a wallpaper when you do not want the product to display a blank screen while not in use.  If the screen resolution is smaller than the S-Box output resolution, use the Factory Menu to turn on the Simple wall mode.
  • Page 60 6. S-Box Installation and Connection (No support for SBB-SNOWJAU or below models) • How to install when use Multi Link HDR function • Product recommend installing this product in a standard 19-inch server rack, please refer 35 page about basic installation guide.
  • Page 61 6. S-Box Installation and Connection (No support for SBB-SNOWJAU or below models) • Multi Link HDR Cable • Use the appropriate cable according to the quantity of S-BOX connected. (Check the number of 2/3/4 connection cables and connectors) Multi Link HDR Port Multi Link HDR Port LED R&D Lab(VD)
  • Page 62 6. S-Box Installation and Connection (No support for SBB-SNOWJAU or below models) • FPGA Update Guide when using Multi Link HDR Cable ※ Note : Before update, disconnect the Multi Link HDR Cable from S-BOX.  Factory update method  LSM update method Multi Link HDR Port ①...
  • Page 63: Settings / How To Use

    Software that remotely adjusts the layout of the LED cabinet • LSM Program Download Location: Samsung Display Solutions (https://displaysolutions.samsung.com) Samsung Display Solutions > SOLUTIONS > SOFTWARE SOLUTIONS > LED Signage Solution > LED Signage Manager ※ Partner login is required for program download LED R&D Lab(VD)
  • Page 64 7. Settings / How to Use 7-1. PC-specific control software Network IP Setting by USB Configuration File (※ S-Box(SBB-SNOWJAU/SBB-SNOWJMU) support since v1050.0) tizen_netconf.toml [network] This is how to set the network information of S-Box with USB device_name = "SNOWBOX“ ip_v4 = "192.168.100.10“...
  • Page 65 7. Settings / How to Use 7-1. PC-specific control software Network IP Setting Tool Execute : [Start] – Program – Samsung – LED Signage Manager – Network Configuration Connect PC and Sbox with RS232C Cable, select connected SerialPort(COM*). And click “open” button.
  • Page 66 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Software for remote control of LED cabinet layout Connect the PC to the S-Box via Ethernet. Use a LAN cable to connect the S-Box to the Interface Gender. S-Box Ethernet Use an OCM cable to connect the Interface Gender to the first LED...
  • Page 67 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Start – Login Page When the LSM is launched for the first time, the password setting page appears. To set a password, enter the same password of your choice twice and click the Start button.
  • Page 68 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) New Connection • To add connection information, use the Search button to search for an IP address or manually enter an IP address. If you click the Search button, the IP address for LSBs available for connection on the same network appear.
  • Page 69 7. Settings / How to Use [★ Caution!] When configuring LED cabinet network settings, it is recommended that a static IP address be used. 7-1. PC-specific control software If DHCP is used and the IP address is changed, the connection with LSM may be disconnected.
  • Page 70 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) [★ Caution!] For internal communication between the S-Box and LED cabinets, use ports 1515, 48484, 48485 and 58585. When firewalls / security network are in use, make sure the corresponding port bet •...
  • Page 71 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Home Window INPUT SOURCE: Shows the LSB input source, resolution and connection duration. LAYOUT: Shows the layout and quantity of all LED cabinets and the quantities of connected and disconnected cabinets. FAULT DEVICE: Shows the IDs of faulty LED cabinets and the fault details.
  • Page 72 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Edit Connection Layout Window Connection layout: Use the LSB output source section to adjust the LED cabinet layout by rearranging cabinets. Feature View: Provides the Edit button used to edit connection information and the automatic LED cabinet alignment function.
  • Page 73 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window Device connection list view: View LSB configuration information. Edit or delete LSB connections. View LED cabinets by group. Connection layout (View Port): View the LED cabinet layout and the position of each LED cabinet Category View:...
  • Page 74 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Device Information/Setting View 1. Basic : . Turn on/off the S-Box. Change the input source. Mute or free the screen. 2. Picture .
  • Page 75 7. Settings / How to Use 7-1. PC-specific control software ※ Refer the module position of LSM (LED Signage Manager) LOD result for IER, IFR and IFJ • Main Window-Connection Window - Device Information/Setting View 6. Cabinet Settings (※ Each menu can be supported for some specific models) .
  • Page 76 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Device Information/Setting View 7. Cabinet Calibration . Perform RGB CC calibration for each module/ Cabinet. . Calibrate the boundary surface of each module. .
  • Page 77 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Device Information/Setting View . Cabinet Calibration └ Multiple Selection : Calibrate the boundary surface of selected multiple modules. Change offset then brightness is adjusted for edge. Use Apply button for applying.
  • Page 78 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Device Information/Setting View . Cabinet Calibration └ Gradation Calibration For expert user only. It can be supported for some models only (IWJ, IWR, …) Color Gradation can be adjusted for module block unit by RGB gain and Luminance value Adjusted value can be reverted by Reset Gradation.
  • Page 79 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window-Connection Window - Sub Information View Monitor Window: View MDC communication logs and information about connected devices. Extract data by using files. LED Signage Cabinet: Shows chip information and cabinet power information.
  • Page 80 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Main Window - Preference Options Set the command retry count. Set the error status checking interval. Set the temperature alert threshold. ※ For some models only (IS, IL) Support Select a language.
  • Page 81 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Dehumidification Mode using LSM The dehumidification mode icon is provided under the S-Box menu. To turn on dehumidification mode, click the icon. (Proceed : 24 hours) It is possible to view how long the dehumidification has been on.
  • Page 82 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • test pattern using LSM S-Box Test Pattern - Utilize when installing cabinets (only for test) When the test pattern is turned on / off or the pattern is changed, background screen may be visible for a while by overlay layer switching.
  • Page 83 7. Settings / How to Use 7-1. PC-specific control software LSM (LED Signage Manager) • Supports mixed two-model installation ※ IER and IER-F can be connected to the same port. There is no connection order for IER and IER-F. Combination is possible within an FHD screen (the same I/G port).
  • Page 84 7. Settings / How to Use 7-2. SW Update ① F/W update via LSM 1. Prepare the update SW File Info.txt FPGAFW.bin L-IERMWWAC-1001.0 Info.txt 2. Click on the "Software Update" button in "Cabinet Settings" on the LSM menu. ※ For AM3352, update files for LSM and USB are different. ※...
  • Page 85 7. Settings / How to Use ※ For AM3352, update files for LSM and USB are different. ※ A separate tool is required to update the FPGA SW to USB. 7-2. SW Update ① F/W update via LSM 3. Click the Browse button to select the SW file to update. Info.txt FPGAFW.bin L-IERMWWAC-1001.0...
  • Page 86 7. Settings / How to Use ※ For AM3352, update files for LSM and USB are different. ※ A separate tool is required to update the FPGA SW to USB. 7-2. SW Update ① F/W update via Prepare the items below. - USB memory formatted in FAT32 format - Copy files for updates to the USB root folder Disassemble the back cover of the Cabinet and insert the USB memory into...
  • Page 87: Power And Cable Connection

    ※ Samsung Electronics is not responsible for problems caused as a result of exceeding the recommended quantity of connections. • The rated voltage for the product and the rated current for the outlet can be found in the label attached on the rear of the product.
  • Page 88 8. Power and Cable Connection 8-2. Precautions during cabinet installation and cable connection (Full Front) 1) If cabinets are installed on a dedicated wall mount, the cabinets are fastened toward the bottom-left direction. Sets can only be installed in the left-to-right direction. →...
  • Page 89 8. Power and Cable Connection 8-3. Cabinet Installation Direction (Full Front Installation) 1) For the lowest row, install cabinets in the left-to-right direction. 2) After installing one row of sets is completed, connect signal and power cables between the cabinets. ※...
  • Page 90 8. Power and Cable Connection 8-4. Cable connection After installation and connection, automatic sorting can be made on LSM. (automatic sorting for cabinets) It is recommended to install the cabinets in automatic sorting order. LED R&D Lab(VD)
  • Page 91 8. Power and Cable Connection Ex ) 8-4. Cable connection FHD 50/60 Hz screen with IER/IFR would be : 4x4 for P2.0 / 5x5 for P2.5 / 8x8 for P4.0 Case 1: Reverse Forward LED R&D Lab(VD)
  • Page 92 8. Power and Cable Connection Ex ) 8-4. Cable connection FHD 50/60 Hz screen with IER-F/IFR-F would be : 16x4 for P2.0 / 20x5 for P2.5 / 32x8 for P4.0 (recommended to install mixed with IER/IFR) Case 2: Reverse 101 94 100 95 ●...
  • Page 93: Seam Adjustment

    9. Seam Adjustment 9-1. Checking and adjusting seam ① On the white screen, check that there is no black line found between cabinets. (See Fig.1.) ② Check for a gap or significant height difference between modules. (See Fig.2.) ※ If a gap is found: A black line is visible from all directions. ※...
  • Page 94 9. Seam Adjustment 9-2. Module disassembly/reassembly Hold the JIG with the UNLOCK marking facing up. Put the JIG to the LED module. Separate the JIG and the module together. Hold the JIG with the LOCK marking facing up. Put the JIG to the LED module to lock the module. Place the new module on the cabinet.
  • Page 95 Appendix IER-F/IFR-F series installation Manual LH0**IER*LS , LH0**IER*FS LH0**IFR*LS , LH0**IFR*FS...
  • Page 96 Table of Contents 0. Product Information 1. Frame Kit & JIG Configuration 2. IER(IFR) Landscape Installation + IER-F(IFR-F) Extension ※ Refer to IER / IER-F installation for IFR / IFR-F installation. 2-1. IER + IER-F Extension (Left to Right) 2-2. IER + IER-F Extension (Up to Down) 2-3.
  • Page 97: Product Information

    0. Product Information ◆ Cabinet product information / Gap to the ◆ Components of the Frame Kit Frame (only for installation of IER-F) Code Installation Remarks Layout VG-LFR13SWL FRAME F (3 Set) VG-LFR11SWL FRAME F (1 Set) FRAME F VG-LFR11PWF (1 Set, PIVOT) PIVOT CY-LJRNEF...
  • Page 98 0. Product Information ◆ IER-F (IFR-F) accessories Product Warranty Card Quick Setup Guide Specification Power Cord (Not provided in some regions) Machine Screws (M4*L10, 13 EA) Extension Power Cable OCM Cable PET Tape (W10*L540,1 EA) COVER PCB (4ea) COVER PCB (6ea) BRACKET LINK (2ea) BRACKET ALIGN (1ea) LED R&D Lab(VD)
  • Page 99: Frame Kit & Jig Configuration

    1. Frame Kit & JIG Configuration • Check the following items in each package. Frame F Lv3 Frame F Lv1 Frame F PIVOT VG-LFR13SWL VG-LFR11SWL VG-LFR11PWF Item Quantity 1x1 PIVOT ASSY BRACKET SIDE ⓐ JOINT V ⓑ SCREW (M4) ⓒ WRENCH ⓓ...
  • Page 100 1. Frame Kit & JIG Configuration • Check the following items in each package. JIG F JIG F PIVOT CY-LJRNEF CY-LJRNPF Item ⓒ ⓑ ⓓ ⓔ Quantity ⓐ STUD - PEM ⓑ L SUPPORT D-TOOL STUD PEM L SUPPORT ⓒ ⓓ...
  • Page 101 2. IER Landscape Installation + IER-F Extension • For installation of IER-F, use 1 x 1 Frame (VG-LFR11SWL) and use the JIG hole gap different from that of IER. (IER: 270 mm / IER-F: 240 mm) • As in the following figure, use the JIG F (NEW) for ①, ③, and ④ and use the previous JIG (included in VG-LFR84FWL, VG-LFR53FWL, and VG-LFR52SWL) for ②.
  • Page 102 2. IER Landscape Installation + IER-F Extension • The JIG F needs 3 different gaps between IER and IER-F, between IER-F cabinets, and between IER-Fs. • In the place with a Stud hole, mount the IER Frame. In the place with two Stud holes, mount the IER-F Frame.
  • Page 103 2. General Installation of IER + IER-F Extension Frame F • There are two types of Frame Kits (LV1 & LV3) for installation of IER-F Landscape (Fig 4). • Different from the IER Frame, be careful upon installation because the Frame F has no direction for left and right. (Fig 5) •...
  • Page 104: Ier + Ier-F Extension (Left To Right)

    2-1. IER + IER-F Extension (Left to Right) • Use the JIG F when installing the IER-F (“F”) left to right on the installed IER Frame. ① • Fasten an IER Frame Side and two Frame Fs on the JIG. •...
  • Page 105: Ier + Ier-F Extension (Up To Down)

    2-2. IER + IER-F Extension (Up to Down) • When F is installed horizontally on the installed IER Frame, use the default JIG of IER (included in VG-LFR84FWL, VG-LFR53FWL, and VG-LFR52SWL). • The Stud location of the default JIG must be adjusted (FIG 9). ②...
  • Page 106: Ier-F + Ier-F Extension (Left To Right)

    2-3. IER-F + IER-F Extension (Left to Right) • Use the JIG F when installing the F left to right on the installed Frame F. • Fasten a Frame F and two Frame Fs on the JIG. ③ IER-F IER-F •...
  • Page 107: Ier-F + Ier-F Extension (Up To Down)

    2-4. IER + IER-F Extension (Up to Down) • Like the vertical extension of the IER Frame, use the Joint V and for this purpose, change the Stud location of the JIG F. • However, in this case, the frames may not be aligned vertically. Accordingly, the vertical and horizontal checks IER-F mandatory.
  • Page 108: Ier-F + Ier-F L-Type

    2-5. IER-F + IER-F L-Type Installation • When there is any L-type installation, install the L-type Frame Kit first of all. • For L-type installation, use two JIG Fs (CY-LJRNEF). • Align the fastened Stud with the L Support and then fasten JIG screws. (Fig 17) •...
  • Page 109 2-5. IER-F + IER-F L-Type Installation • When the Frame F Lv3 is used, repeat JIG fastening and screw fastening from top to bottom. • After fastening the Frame F to the wall with screws, for detaching the JIG F from the Frame F, Remove a JIG F from the L Support and then remove another JIG F.
  • Page 110 2-5. IER-F + IER-F L-Type Installation Cabinet Installation • For IER-F L-type installation, use only two among four BOLT ETCs and remove the BOLT-ETCs not in use. (Fig. 21) • In the joint where two cabinets are met (L-type corner), do not use the BOLT ETC but the outer BOLT-ETC. (Fig. 22) •...
  • Page 111 2-5. IER-F + IER-F L-Type Installation Cabinet Installation • During L-type installation, a module covers another one. This direction can be determined, noting the L Support mark while installing the Frame Kit. Module overlapping direction fr om the current JIG point of vie In case of opposite overlap, use it upside down.
  • Page 112 2-5. IER-F + IER-F L-Type Installation Cabinet Installation • Mount IER-F Cabinets one by one. • Remove two (Up and Down) of three modules. • Assemble the Bracket Link and fasten it with screws through the hole in the L-shaped corner where the module has been removed.
  • Page 113 2-5. IER-F + IER-F L-Type Installation BRACKET-LINK • Remove the Insulator Sheet attached to the Bracket Link’s assembly part of the Cover Rear. • Check the Bracket Link assembly marks to make sure that the TOP is assembled with the TOP and the BTM with the BTM. •...
  • Page 114 2-5. IER-F + IER-F L-Type Installation BRACKET-LINK • When IER-Fs are stacked upward, fasten the Bracket Align that is used to compensate for Z-axis difference between top and bottom cabinets. • Remove the bottom module from the upper cabinet and the top module from the lower cabinet. •...
  • Page 115 3. [PIVOT] IER + IER-F Extension • During installation of IER Pivot, install the IER-F with the JIG F Pivot (CY-LJRNPF). IER PIVOT FRAME <Frame Kit for Installation of IER-F Pivot> ① IER-FRAME F ② PIVOT • A: Frame gap for extension of IER-Fs (Left to Right) •...
  • Page 116 3. [PIVOT] IER + IER-F Extension • When installing the IER Pivot, install the Cabinet by turning it clockwise (from Front view). → Install it by turning the arrow on the rear to be upward. • For installation of IER-F, use the Frame F Pivot (VG-LFR11PWF) and JIG F Pivot (CY-LJRNPF). •...
  • Page 117 3-1. [Pivot] IER + IER-F Extension (Up to Down) • Fasten an IER Pivot Frame and two Frame F Pivots on the JIG. • Align the JIG Stud with the JIG hole of the Frame. • Fasten the Frame F Pivot to the wall with screws. ①...
  • Page 118 3-2. [Pivot] IER-F + IER-F Extension (Left to Right) • Fasten the installed Frame F Pivot and two Frame F Pivots to install on the JIG. • Align the JIG Stud with the JIG hole of the Frame. (without using the JIG screws) •...
  • Page 119 3-3. [Pivot] IER-F + IER-F Extension (Up to Down) • Fasten the installed Frame F Pivot and two Frame F Pivots to install on the JIG. • Align the JIG Stud with the JIG hole of the Frame. (without using the JIG screws) ③...
  • Page 120: Fastening The Cover Pcb

    4. Fastening the Cover PCB • After IER + IER-F Cabinet installation, fasten the Cover PCB to the outermost edge to fix the Module. • You can fasten two Cover PCBs on the horizontal side and a Cover PCB on the vertical side based on a module. •...
  • Page 121 Thank you...
  • Page 122 Network IP Setting Menu Use the File Explorer to go to the folder where LSM is installed. Select [Start] – Programs – Samsung – LED Signage Manager – Network Configuration. Use the RS232C cable to connect the PC to the S-Box. Select the connected Serial port and press the Open button to establish a connection.
  • Page 123 Appendix 2 – IFR P1.5 Screen FAN guide ■ LED Signage FAN installation Guide : Screen temp 60℃ under - Cannot install IFR P1.5 in Pivot position → IFR P1.5 Pivot installation is only possible in case of satisfying temperature condition, and only with FAN installation Temperature condition Landscape ※...

This manual is also suitable for:

Ier-f seriesIfr seriesIfr-f seriesLh0 ier ls seriesLh0 ier fs seriesLh0 ifr ls series ... Show all

Table of Contents