Download Print this page

Samsung IAB Series Install Manual page 103

Led display
Hide thumbs Also See for IAB Series:

Advertisement

Product disassembly method – 2) Internal disassembly of docking station
⑦ SMPS disassemble
Remove the screw 6 points that are fastened like the Insulator.
Remove the screw 1 point that is fastened to SMPS alone.
Remove Bracket-Align.
1
1
1
AC inlet
AC inlet
※ When disassembling SMPS, make sure to check whether it is
discharged or not. For more information, 'Trouble Shooting - SMPS
Disassembly'
2
Bracket-Align
6001-003016
6001-002610
SMPS
subsidiary
Insulator
1
Bracket-Align
SYSTEM
102
Code
Specification
M3 / L5
PWH / ZPC (WHITE)
M4 / L6
BH / ZPC (BLACK)
Code
Specification
part
1
PC, L536.5, W356,
BN63-20338A
중앙 (AL+PC T0.25 합지)
BN61-16709A
2
LED R&D Lab(VD)
Shape
Quantity
Total : 28
Total : 12
Quantity
Total : 4
T0.6
Total : 12

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series