Download Print this page

Samsung IAB Series Install Manual page 113

Led display
Hide thumbs Also See for IAB Series:

Advertisement

Product disassembly method – 2) internal disassembly of docking station (P1.26, 110")
⑦ SMPS disassemble
Remove the screw 6 points that are fastened like the Insulator.
Remove the screw 1 point that is fastened to SMPS alone.
Remove Bracket-Align.
SMPS
1
1
1
SMPS
SMPS
AC
inlet
SYSTEM
112
※ When disassembling SMPS, make sure to check whether it
is discharged or not. For more information, 'Trouble Shooting
- SMPS Disassembly'
2
Code
Bracket-Align
6001-003016
SMPS
6001-002610
부자재
1
Insulator
Bracket-Align
2
Specification
Shape
M3 / L5
PWH / ZPC (WHITE)
M4 / L6
BH / ZPC (BLACK)
Code
Specification
PC, L536.5, W356,
BN63-20339A
T0.6
BN61-16709A
LED R&D Lab(VD)
Quantity
Total : 21
Total : 9
Quantity
Total : 3
Total : 9

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series