4. FRAME installation and cable connection
⑫ After assembling two or more ASSY BRACKET P-FRONTs, match each other's Z seams.
<Z seam control method>
- Use a driver to open the space between the two modules.
Insert driver
Fig1. Driver usage location
Fig2. making GAP
Driver push direction
Module moving direction
59
LED R&D Lab(VD)