  • Page 1 LED Display installation Manual IWB Series LH009IWBMES LH006IWBMES (Under development) Ver. 1.2 LED R&D Lab(VD)
  • Page 2 Revision History Version Date (Y/M/D) Description 2022/07/08 New Release 2022/07/27 Update Preparation for Cabinet Installation (Open Box, Removal of COVER-CORNER, Fix screw on top of cabinet) 2022/09/07 Update max length of optical cable LED R&D Lab(VD)
  • Page 3 Do not play any contents on the screen before dehumidification finishes. ∙ Case when vacuum packaging is already unsealed before unpacking products. ∙ Case when environment condition is worse than Samsung working condition (0°C~40°C/10~80%RH). ∙ Case when it elapses longer than 7 days after unpacking them, even though the environment condition satisfies Samsung working condition (0°C~40°C/10~80%RH).
  • Page 4 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during installation  How to install the screen in the case that dehumidification is necessary ※ Before finishing the directions explained in next pages, never play other contents or use them. ※...
  • Page 5 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during installation  How to install the screen in the case that dehumidification is necessary. S-Box should play only this pattern. 3.
  • Page 6 This contents must be noticed to customer. Please print this page and hand it to user. Dehumidification guidance – during operation • Electrical short in package is possible to happen during products are working. • For keeping quality of products during installation, please refer below cautions.
  • Page 7 Please print this page and hand it to user. Dew condensation due to overcooling  Even though meet with Samsung recommended operation condition, dew condensation is possible to happen when surface of products is colder than environment temperature or hot & humid air blow to cooled surface of products.
  • Page 8 This contents must be noticed to customer. Please print this page and hand it to user. Prevention of condensation by Air Conditioner  Do not let cold wind hit the screen directly. - If cold wind from the screen surface A/C directly touches, condensation may form depending on the ambient humidity and the temperature of the screen.
  • Page 9 Mandatory conformation guide before installation • Power cable and OCM cable must be firmly inserted. • When installing the cabinet (IWB), do not use the cabinet with different LED rank and film rank. • Each cabinet has its own LED/Film Rank information It must be installed as a set of the same rank. ※...
  • Page 10: Table Of Contents

    Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 11: Product Information And Installation Precautions

    This manual is an installation manual for IWB and can be applied to the following models Model Product appearance and information IWB series IWB Series : CoB Type / 120Hz Refresh Rate Remark SNOW-AAE(S-Box) : IWA P0.84/P1.26/P1.68, IWB P0.63/P0.94 SNOW-ACE(M-Box) : IWA P0.84 / IWB P0.63(TBD) B2C Only...
  • Page 12 1. Product Information and Installation Precautions ◆ Product Specification (IWB) Spec P0.63 P0.94 1209.4 Size (mm) 680.3 1920 1280 해상도 1080 Module Quantity 8 X 6, 48EA 21.9 kg(TBD) 22 kg (Only cabinet) Weight Cabinets (Cabinet & All package) 22.7 kg(TBD) 22.8 kg (All package) 250W(TBD) Power Consumtion (W)
  • Page 13 Product Main Specifications ◆ 모델 사양 (IWB) Remark IWB P0.63 55” IWB P0.945 55” Pitch 0.63mm 0.945mm LED Bin Floating Bin Floating Bin Resolution 1920 X 1080 1280 x 720 Basic COB (Chip On Board) COB (Chip On Board) LED Type 183x94x60 183x94x60 Dimensions (W x D x H)
  • Page 14 1. Product Information and Installation Precautions ◆ FRAME KIT and BEZEL KIT Composition Installation Type Division Frame Kit Remark configuration 1*1 (1 Set) VG-LFB11SWB FRAME KIT 2*2 (4 Set) Full kit VG-LFB22SWB 3*3 (9 Set) VG-LFB33SWB INSTALLATION Full kit CY-WJBPBP TOOL KIT 1*1 (1 Set) VG-LFB11SDB...
  • Page 15 1. Product Information and Installation Precautions ◆ Cabinet Product information ◆ S-Box Product information - Model : LH009IWBMES/xx (P0.94) - Model : SBB-SNOWAAE/xx LH006IWBMES/xx (P0.63) <S-Box / IG > LED R&D Lab(VD)
  • Page 16 1. Product Information and Installation Precautions ◆ Precautions for Installation (LED Damage) Cautions Image [Beware of Outside Impact, Fall] ① Beware not to cause any impact on the LED screen or drop the product on MODULE the floor after the protection gets taken off for installation. Front ①...
  • Page 17 1. Product Information and Installation Precautions ◆ Precautions for Installation (LED Damage) Cautions Image [Beware of liquid damage to the LED] If water or various chemicals come into contact with the LED, the inside of the LED can be damaged. ①...
  • Page 18 1. Product Information and Installation Precautions ◇ Caution for cleaning screen ★Caution★ - Watch out for damage when cleaning gap between Half- Cabinets - Watch out for damage when cleaning gap between Modules - Do not insert any cleaning tool or spay cleaner directly into the gap - It is recommended to wipe with a soft cleaning cloth provided with the product.
  • Page 19 ◆ A guide for radiant heat Written under ‘Video, (back light 50)’ standard  Installation Condition Standard for using SAMSUNG FRAME KIT In principle, solar window direct radiation condition installation is avoided. Room temperature is recommended to be less than 25 ℃.
  • Page 20 • Flow calculation and FAN selection example – Select model and screen configuration from the following site https://displaysolutions.samsung.com/support/tools/led-configurator – PDF download after login – If the flow rate is indicated, it is necessary to install a fan and air conditioner.
  • Page 21 1. Product Information and Installation Precautions • Vertical wall installation (if fan is not applied) set ~ ceiling At least 30mm Air vent area set ~ floor At least 30mm LED R&D Lab(VD)
  • Page 22 1. Product Information and Installation Precautions • Recessed installation (if fan is not applied) Recommended condition: 500mm or more set ~ ceiling Air vent area At least 30mm (Aperture ratio 100%) Minimum Separation Distance ※ If aperture ratio is not 100%, Aperture ratio Separation Distance = (%) / 100...
  • Page 23 1. Product Information and Installation Precautions • Vertical wall installation (when fan is applied) set ~ ceiling At least 30mm Sealed except for FAN Left and right side sealing Air vent area set ~ floor At least 30mm LED R&D Lab(VD)
  • Page 24 1. Product Information and Installation Precautions • Recessed installation (when fan is applied) Recommended condition: 500mm or more set ~ ceiling At least 30mm Sealed except for FAN (Aperture ratio 100%) Left and right side sealing Air vent area At least 30mm (Aperture ratio 100%) Recommended condition: 500mm or more set ~ floor...
  • Page 25 1. Product Information and Installation Precautions • Notes on Recessed installation 150mm left and right space required for serviceability. (Fig.1)  Due to the characteristics of the product, the fixing screw is placed inside, so it is necessary to secure a field of view of about 150mm. (Fig.2) ...
  • Page 26 1. Product Information and Installation Precautions • Duplex installation  If the flow rate is indicated on the flow calculation site, it is necessary to install a fan and air conditioner. At least 30 mm Minimum Separation Distance  Minimum separation distance from wall 30mm or more (Aperture ratio 100%) Aperture ratio ...
  • Page 27 1. Product Information and Installation Precautions ◆ Ready to install • The preparations included in the Frame Kit are on the Frame kit installation page. ※ Recommended standard • Supplied in the accessory kit.(CY-WJBPBP) ※ When purchasing the product as an optional item, it must be purchased together.
  • Page 28 1. Product Information and Installation Precautions ◆ Cabinet Accessories List REGULATORY GUIDE LEAFLET - WEEE Easy Setup Guide LABEL – WARRANTY Spare Module * 2EA (It is not provided in some areas) AC Power Cable Power extension OCM Cable WEB Manual (It varies from country to country) 3903-000376 (BN39-02743A)
  • Page 29 System Configuration for Screen • □ AAE S-box Configuration diagram – IWB P0.945 Forward Backward IWB P0.945 Main Control PC AV Source Control Signal (LAN) Service Port HDMI, DP S/BOX Laptop Blu-ray Camera Card Optic Cable (max 100m) HDMI HDMI Video Wall Controller Card Card...
  • Page 30 Screen Configuration - Cable □ Special Features of Screen Configuration (Compared to former models) – IWB P0.94 ▶ Configure screen according to video size in half units - Cabinet Configuration : FPGA 1EA + AM3352 1EA + In/Out Port x 2 ※...
  • Page 31 Screen Configuration - OCM Cable □ Cable Connection Features by location – IWB P0.94 ※ Cable Connections (ex. 3 X 3) ① S-Box → I/G Card → First Cabinet Optic Cable OCM Cable OCM Cable OCM Cable ② I/G Card  Second cabinet OCM Cable OCM Cable Optic...
  • Page 32 Screen Configuration – ( Cable ) • □ AAE S-box Configuration diagram – IWB P0.63 Forward Backward Monitoring (Same screen that displays out to LED Display Set) IWB P0.63 Main Control PC AV Source Control Signal Card Card (LAN) Service Port HDMI, DP S/BOX Laptop...
  • Page 33 Screen Configuration - OCM Cable □ Cable Connection Features by location – IWB P0.94 ※ ※ Cable Connections (ex. 2 X ① S-Box → I/G Card → First Cabinet 2, 4K) Optic OCM Cable OCM Cable Cable ② I/G Card  Second cabinet OCM Cable OCM Cable Optic...
  • Page 34 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 35: Preparation For Cabinet Installation

    2. Preparation for Cabinet Installation ◆ Preparations before installation ① Remove the band surrounding the box. ② Open the top of the box and take out accessories and spare modules. ③ Lift the top of the box and take out the product wrapped in a vacuum packaging bag. ④...
  • Page 36 2. Preparation for Cabinet Installation ◆ Preparations before installation ◇ Connect the power cable to the SET and check whether the LED is damaged and the screen display. ① After AC power is applied, press the switch on ④ 3 sec the rear side for 1 second to release the power Dehumidifying NO VIDEO...
  • Page 37 2. Preparation for Cabinet Installation (If module service is required after pre-inspection) - If the defective module needs to be replaced 1) Place the product in a flat place and lift the frame part attached with a magnet. 2) Remove the power connection cable on the left and right sides of the center of the product and remove the frame. LED R&D Lab(VD)
  • Page 38 2. Preparation for Cabinet Installation (If module service is required after pre-inspection) 3) Unscrew the bridge board or TCON board above the module to replace. (Fig 1) 4) Remove the screw (same as SCREW G in accessory kit) surrounding the module to be replaced (18EA) and remove the module.
  • Page 39 2. Preparation for Cabinet Installation (If module service is required after pre-inspection) - Z step adjustment between modules is required 1) After checking the location of occurrence, separate the module units according to the order of pages 37, 1) to 2). (The adjustable position is where the 1*3 unit module meets) Adjustable position 2) Unfasten the fastening screw of the lower part of the module and fasten SCREW I (BN81-21525A) included in the accessory kit to the adjustment hole to support and correct it.
  • Page 40 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 41: Frame Kit Components

    3. Frame kit Components - FRAME KIT / ACCESSORY Components VG-LFB11SWB VG-LFB22SWB VG-LFB33SWB (1 X 1) (2 X 2) (3 X 3) Item 1.FRAME TOP 2. FRAME TOP SHORT 3.FRAME BOT Q’TY Q’TY Q’TY FRAME TOP FRAME TOP SHORT FRAME BOT FRAME BOT SHORT FRAME SIDE 4.
  • Page 42 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 43: Frame Installation

    4. Frame installation ※ Precautions for Fastening the Screws LED R&D Lab(VD)
  • Page 44 4. Frame installation (1*1, 2*2) ① Arrange FRAME TOP, BOT, and MID (for 2*2) and install FRAME SIDE and Vertical MID (for 2*2). VG-LFB22SWB (2*2) VG-LFB11SWB (1*1) • Pay attention to the assembly direction. * Assemble according to guide groove check check •...
  • Page 45 4. Frame installation (Normal installation, 3*3) ①’ FRAME TOP, BOT, and HRZ MID, and insert HRZ LINK and HRZ C LINK for extension. ①’ Insert FRAME SIDE and MID. • Pay attention to the assembly direction. * Assemble according to guide groove •...
  • Page 46 4. Frame installation (1*1, 2*2) ② Fasten the vertical frame and the horizontal frame. - Fix between FRAMEs using SCREW A (M6,L10) Fastening points (SCREW A) (for 2*2= 12) Fastening points (SCREW A) (for 1*1= 4) LED R&D Lab(VD)
  • Page 47 4. Frame installation (3*3) ② Fasten the vertical frame and the horizontal frame. - Fix FRAMEs using SCREW A (M6,L10) - Fix with FRAME and LINK using SCREW B (M4,L6) Fastening points (SCREW A) (for 3*3= 36) Fastening points (SCREW B) (for 3*3= 32) LED R&D Lab(VD)
  • Page 48 4. Frame installation (3*3) ③ Install the assembled FRAME on the wall ※ Before installation and during handling, it needs to be erected and moved to prevent bending. (Put down and move X) - Fix one of the center top fastening points A to the wall first with BOLT (M5, L55), check if the screw hole is on the same horizontal line using a laser level, and then fasten it to the rest of the holes.
  • Page 49 4. Frame installation BRACKET-IG SUB ④ Assemble the BRACKET-IG according to the installation environment. Check the installation location of the IG card and bridge box according to the BRACKET-IG installation resolution and installation size BRACKET-IG and assemble them with SCREW B (M4, L6). SCREW B (M4, L6) SCREW B (M4, L6) * When installing B / IG at the top...
  • Page 50 4. Frame installation VERTICAL LINK VERTICAL BLOCK ※ Note 1. FRAME extension in vertical direction - Place FRAME H and FRAME V as extended installation specifications. (Fig. 1) - Insert the VERTICAL LINK and VERTICAL BLOCK into the extended connection area. (Fig. 2) - Adjust the distance using the EXTENSION GUIDE JIG.
  • Page 51 4. Frame installation ※ Note 2. FRAME extension in horizontal direction H LINK H CENTER LINK - Place FRAME H and FRAME V as extended installation specifications. (Fig.1) - Insert HORIZONTAL LINK and H CENTER LINK into the extended connection area. (Fig.2) (If extend the frame that has already been installed on the wall, it will be omitted.
  • Page 52 4. Frame installation ※ Note 2. FRAME extension in horizontal direction - Insert the EXTENSION GUIDE JIG into two extended FRAME SIDEs according to the guide and fix them by turning the captive screw. (Basically, install according to the 0 mark of the guide jig, and if the entire frame needs to be narrowed or widened, assemble it narrowly or widely by 1mm according to the -1 and +1 marks. (Fig.3)) - Connect FRAME ↔...
  • Page 53 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 54: Cabinet Installation

    5. Cabinet installation ※ Pre-work before cabinet installation - HDBase-T Cable, Bluetooth/Wi-Fi module, and 24pin system cable are connected to Bridge Box. - IR/ECO sensor module connects to IG Group 1. [S-Box/M-Box] 24pin system Cable Bridge Box HDBaseT Cable Bluetooth/Wi-Fi Cable Bottom Sensor(Bluetooth/Wi-Fi) Sensor Top(IR/ECO Sensor) ※instructions...
  • Page 55 Must CONNECT the devices less than the recommended maximum number of devices. ※ Samsung Electronics is not responsible for AC power connecting exceed recommended maximum number of devices. The label info which is attached behind product shows rated power of cabinet and rated current of outlet.
  • Page 56 5. Cabinet installation  4K, 2x2, OCM Cable Connect Screen(IWB P0.63) (P0.63 Imprinting and Connector Specifications) IG #1 –Forward S Box OCM Cable Optical Cable IG #2 – Forward OCM Cable Optical Cable LED R&D Lab(VD)
  • Page 57 5. Cabinet installation  4K, 2x2, OCM Cable Connect Screen(IWB P0.63) + IG Redundancy (P0.63 Imprinting and Connector Specifications) S Box IG #1 –Forward OCM Cable Optical Cable IG #1 – Redundant Optical Cable OCM Cable IG #2 – Forward OCM Cable Optical Cable IG #2 –...
  • Page 58 5. Cabinet installation  4K, 3x3, OCM Cable Connect Screen(IWB P0.94) (Data2 in <- Data1 out) (Data1 out -> Data1 in) (P0.94 P0.63 Imprinting and Connector Specifications) S Box IG #1 –Forward OCM Cable Optical Cable OCM Cable Optical Cable Video+Control IG #2 –Forward LED R&D Lab(VD)
  • Page 59 5. Cabinet installation  4K, 3x3, OCM Cable Connect Screen(IWB P0.94) + IG Redundancy (Data2 in <- Data1 out) (Data1 out -> Data1 in) (P0.94 P0.63 Imprinting and Connector Specifications) S Box IG #1 –Forward OCM Cable Optical Cable Optical Cable OCM Cable IG #1 –...
  • Page 60 5. Cabinet installation  2x2, OCM Cable Connect Screen(IWB P0.94) (Data2 in <- IG #2 FWD) (Data1 out -> Data1 in) (P0.94 P0.63 Imprinting and Connector Specifications) S Box IG #1 –Forward OCM Cable Optical Cable OCM Cable Optical Cable IG #2 –Forward LED R&D Lab(VD)
  • Page 61 5. Cabinet installation  2x2, OCM Cable Connect Screen(IWB P0.94) + IG Redundancy (Data2 in <- IG #2 FWD) (Data1 out -> Data1 in) (P0.94 P0.63 Imprinting and Connector Specifications) S Box OCM Cable Optical Cable IG #1 –Forward Optical Cable OCM Cable IG #1 –...
  • Page 62 5. Cabinet installation Connect Configuration by Resolutions(IWB P0.94) Pitch P0.94 Model Resolutions 1280 x 720 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 3 x 3 = 9 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 63 5. Cabinet installation Connect Configuration by Resolutions(IWB P0.94) Pitch P0.94 Model Resolutions 1280 x 720 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 3 x 3 = 9 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■...
  • Page 64 5. Cabinet installation Connect Configuration by Resolutions(IWB P0.94) Pitch P0.94 Model Resolutions 1280 x 720 Size 4K UHD Screen Resolutions 3840 x 2160 Cabinet 3 x 3 = 9 Installation Type Cable Backward Redundancy IG add-on S-Box add-on 2(+2) Q’ty S-Box 1(+1) ■S-box add Redundancy configuration...
  • Page 65 5. Cabinet installation Connect Configuration by Resolutions(IWB P0.94) Pitch P0.94 Model Resolutions 1280 x 720 Size Screen Resolutions 7920 x 4320 Cabinet 6 x 6 = 36 Installation Type Cable Backward Redundancy IG add-on S-Box add-on Q’ty S-Box ■ Basic connection IG#5 IG#6 IG#7...
  • Page 66 5. Cabinet installation Connect Configuration by Resolutions(IWB P0.94) Pitch P0.94 Model #®8 #®5 #®6 #®7 Resolutions 1280 x 720 Size Screen Resolutions 7920 x 4320 Cabinet 6 x 6 = 36 Installation Type Cable Backward Redundancy IG add-on S-Box add-on 8(+8) Q’ty S-Box...
  • Page 67 5. Cabinet installation ① Remove screws fastened to the COVER-CORNER. COVER-CORNER LED R&D Lab(VD)
  • Page 68 5. Cabinet + Frame installation (for 2x2) ② Install the bolt on the back of the 1st cabinet by inserting it into the hole of FRAME. ※ Move and install the cabinet in groups of two. - Start on the left (or right) side of the lowest line of FRAME and install it by stacking it below. (Fig.1) Bolt point Figure 1 Example of Installation Sequence by 2x2, 3x3...
  • Page 69 5. Cabinet + Frame installation (for 2x2) ③ Fasten one SCREW D (M4,L8) to the left and right sides of the bottom of the 1st cabinet and the upper and lower left ends. - Be careful not to adsorb between modules ④...
  • Page 70 5. Cabinet + Frame installation (for 2x2) ⑤ Fasten the SCREW D (M4,L8) on the left and right sides of the bottom with reference to ② in the 2nd cabinet. At this time, the Y-direction step difference with the side cabinet is adjusted by adjusting the fastening depth of the SCREW. ⑥...
  • Page 71 5. Cabinet + Frame installation (for 2x2) ⑦ Two Headless bolts E (M4,L8) are fastened to the right outer cabinet of SCREEN to remove the gap between the cabinets and fix them so as not to move. ⑧ Fasten the SCREW F (M4, L12) at the top of the cabinet shown in the figure below. Tighten only until there is no space between the screw head and the frame, not pulling while fastening.
  • Page 72 5. Cabinet + Frame installation (for 2x2) ⑨ Install the 3rd cabinet in FRAME in the same way as ①. Lift the upper module and adjust the Z step in the same way as ⑤. - Turn counterclockwise and the module come forward cabinet - Use the 2mm hexagonal wrench...
  • Page 73 5. Cabinet + Frame installation (for 2x2) ⑨-2 In order to protect the module from the impact caused by moving the module up and down, work by attaching the enclosed protection jig in the installation frame. (Maintenance of 1mm interval) 0.5mm ⑩...
  • Page 74 5. Cabinet + Frame installation (for 2x2) ⑪ Fasten SCREW D (M4,L8) on the left side of the upper cabinet and Headless bolt E (M4,L6) on the upper and right sides. The screw is tightened to the end, and reduce the upper and lower gaps using a Headless bolt. cabinet cabinet ⑫...
  • Page 75 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 76: Frame Bezel Components

    6. FRAME BEZEL Components - FRAME BEZEL Components VG-LFB11SDB VG-LFB22SDB VG-LFB33SDB (1 X 1) (2 X 2) (3 X 3) Item Q’TY Q’TY Q’TY BEZEL TOP BEZEL TOP SHORT BEZEL SIDE BEZEL BOTTOM 1. BEZEL TOP 2. BEZEL TOP SHORT 3.
  • Page 77 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 78: Frame Bezel Installation

    7. Frame Bezel installation ① Assemble sensors according to the location according to the installation scenario. - Remove the COVER-CAP in the BEZEL TOP and BEZEL BOTTOM and assemble the sensor. COVER-CAP 1) Remove COVER-CAP. BEZEL TOP BEZEL BOTTOM 2) Insert the sensor in the direction and assemble it by pressing it until it makes a click sound.
  • Page 79 7. Frame Bezel installation ② Install the BEZEL SIDE on the left and right sides of the installed cabinet. SPACER (0.5mm) FRAME SIDE * When assembling the BEZEL SIDE, if the frame is too tight to assemble, remove the attached SPACER and assemble it. LED R&D Lab(VD)
  • Page 80 7. Frame Bezel installation ③ Place the BEZEL TOP and BEZEL BOTTOM up and down the cabinet. - The magnet located at the end of the screen is temporarily supported by the force of the magnet. LED R&D Lab(VD)
  • Page 81 7. Frame Bezel installation (incase of horizontal 3 sets) ③-1 When installing three horizontal stages, first fasten one side of BRACKET-LINK to BEZEL TOP/BOTTOM LONG. SCREW * 2EA (M3, L5) BEZEL TOP/BOTTOM (LONG) LED R&D Lab(VD)
  • Page 82 7. Frame Bezel installation (incase of horizontal 3 sets) ③-2 Position the BEZEL TOP/BOTTOM LONG that has assembled BRACKET-LINK first, place the BEZEL TOP/BOTTOM SHORT, and assemble it between BEZEL TOP/BOTTOM. SCREW A * 4EA (M3, L5) LED R&D Lab(VD)
  • Page 83 7. Frame Bezel installation ④ Fasten with SCREW B (M4, L10) to fix the cabinet and bezel. - The lower part is additionally fastened to the middle of the cabinet in case of sagging. SCREW B * 2EA (M4, L10) LED R&D Lab(VD)
  • Page 84 7. Frame Bezel installation ⑤ Connect the edge BEZEL TOP, BOTTOM and BEZEL SIDE to screw A (M3, L5) and connect them between bezels. SCREW A * 2EA (M3, L5) LED R&D Lab(VD)
  • Page 85 7. Frame Bezel installation * When filling is needed due to gaps between BEZELs, attach the enclosed GAP SHEET to fill it. GAP SHEET GAP SHEET LED R&D Lab(VD)
  • Page 86 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 87: S-Box Installation And Connection

    8. S-Box Installation and Connection • S-BOX Connection (SNOWAAE) ※ Names of parts from Front / Rear side of the SET - Please refer to the image below for the names of each part on the front and back of the set. - Front side Info LCD Jog Key...
  • Page 88 8. S-Box Installation and Connection • SNOWAAE S-BOX Connection ① Input video signal to S-BOX. (Input port : HDMI, DP) ② Check the input signal through SOURCE STATUS.(RED : HDMI1 , GREEN : HDMI2, Blue : DISPLAY PORT) ③ AAE Box supports 8K(7680 x 4320 @60Hz) input resolutions. ※...
  • Page 89 8. S-Box Installation and Connection □ IG Settings by screen configuration ( SNOW-AAE Only - Manual IG Switch settings decide Vx1 / STB Power / UART specification by screen type - Settings by screen type IWB Model Pillar Structure not used ※...
  • Page 90 8. S-Box Installation and Connection • Optical Cable Connection ① Optical Cable Connection Connect optical cable from One connect terminal of AAE S-Box to Module Rx of I/G Board. ※When the optical modules Tx and Rx are connected, they must be connected by an optical cable without FDF connection or optical fusion.
  • Page 91 8. S-Box Installation and Connection ② Instruction for handling Optical Cable  Use BIMMF, OM3, LC-LC connector type optical cable for stability of operating. * BIMMF (Bend Insensitive Multimode Fiber) ★ Unusable : Single Mode, OM1, OM2 type  Do not contact with device sharp and rough. ...
  • Page 92 8. S-Box Installation and Connection ③ Cable Connection  Since it is a common cause of malfunction, special attention is required when connecting the connector.  In the case of duplex type, the locking structure is released and connected one by one like Simplex. S-Box (SNOW-AAE) Cabinet Duplex...
  • Page 93 8. S-Box Installation and Connection ③ Cable Connection  Remove the dust protection cap and connect the cable as below picture.  Insert with weak force until it sounds “Click”.  Keep the dust protection cap well for reuse. Insert a protection cap on an unused port to protect from dust.
  • Page 94 8. S-Box Installation and Connection ③ Cable Connection  Check it whether the cable is inserted well.  Install the optical cable carefully. The optical cable does not have the tension of the upper/lower and the left/right. LED R&D Lab(VD)
  • Page 95 8. S-Box Installation and Connection ③ Cable Connection  When you remove the cable, press the detach clip to remove it. Do not just pull the cable as below.  Do not force the optical cable by pulling it up and down. LED R&D Lab(VD)
  • Page 96 8. S-Box Installation and Connection ④ Instruction for handling Optical Cable  Consider the pulling force so that the minimum force is applied to the optical fiber when installing the cable. (Refer to each cable specification.)  Optical loss occurs, If the optical cable is bent above the allowed bending radius. Install cable below allowed bending radius.
  • Page 97 8. S-Box Installation and Connection ④ Instruction for handling Optical Cable  Gently fix the optical cable to prevent direct compression when fixing it to Tray and so on. Tighten the clamp Clamp tightening properly Fixed soft material Fixing the excess clamp of cable ...
  • Page 98 8. S-Box Installation and Connection  24V Adaptor Connection ① Adadptor Connection  Connect the enveloped 24V adaptor to rear power connector.  Power on using Power button from Remote controller enveloped or push button at the front. [Caution] ※ When powering on/off for the TEST, give enough time (more than 5mins) to be stable. LED R&D Lab(VD)
  • Page 99 • S-Box Connection (Panel Configuration) ① S-Box Default Picture Setting • The default picture configurations are optimized for IWA/IWB Cabinet in Samsung factory. • The picture configurations will be configured automatically when you finish the installation. • For the best picture quality, Please connect S-Box and LED displays via LSM software properly.
  • Page 100 8. S-Box Installation and Connection • S-Box Connection (Panel Configuration) ② S-Box Connection (Grouping)  Home → Video Wall : OFF → On [Caution] Before executing S-Box Grouping in LSM (LED Signage Manager), be sure to set the resolution of the input source device to the resolution supported by S-Box Grouping.
  • Page 101 8. S-Box Installation and Connection • S-Box Connection (Panel Configuration) ③ Setup the resolution of input PC • PC: Click the right button of mouse → Click Screen resolution → Click Advanced settings • Click “Monitor” tap → Monitor Settings → Setup “Screen refresh rate” to 60Hz LED R&D Lab(VD)
  • Page 102 8. S-Box Installation and Connection ④ S-Box Grouping Support Frequency (1/2) LED R&D Lab(VD)
  • Page 103 8. S-Box Installation and Connection ④ S-Box Grouping Support Frequency (2/2) LED R&D Lab(VD)
  • Page 104 8. S-Box Installation and Connection • S-Box Connection (Panel configuration) ⑤ Picture Menu Settings • In order to use S-Box grouping, both Dynamic Contrast and Black Tone functions should be turned off to reduce the image quality deviation between S-Boxes. •...
  • Page 105 8. S-Box Installation and Connection ④ S-box Grouping Support Frequency (2/2) Service Port is a terminal dedicated to monitoring to check the operation status of the source being played and using the OSD ① during the initial installation of the S-Box. The resolution of the corresponding PORT is FHD (1920*1080 @ 60Hz).
  • Page 106 Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 107: Lsm Configuration And Usage Description

    • Software to remotely control the layout of the LED cabinet • LSM program download location : Samsung Display Solutions (https://displaysolutions.samsung.com) Solutions > LED Signage Solution > LED Signage Manager ※ Partner login is required to download the program. LED R&D Lab(VD)
  • Page 108 9. LSM configuration and usage description 9-1. Control Program for PC 1. Connect the PC to the S-Box via Ethernet. 2. Use a LAN cable to connect the S-Box to the Interface Gender. 3. Use an OCM cable to connect the Interface Gender to the first LED cabinet. 4.
  • Page 109 9. LSM configuration and usage description 9-1. Control Program for PC When the LSM is launched for the first time, the password setting page appears. To set a password, enter the same password of your choice twice and click the Start button. If you do not want to use a password, select the “Don’t use password”...
  • Page 110 9. LSM configuration and usage description 9-1. Control Program for PC To add connection information, you can directly enter Search or IP address. If you click the Search button, the IP address of the S-BOX that can be connected on the same network is displayed. If you know the IP address of S-BOX, you can enter it directly.
  • Page 111 9. LSM configuration and usage description [★ Caution!] When configuring LED cabinet network settings, it is recommended that a static IP address be used. 9-1. Control Program for PC If DHCP is used and the IP address is changed, the connection with LSM may be disconnected.
  • Page 112 9. LSM configuration and usage description [★ Caution!] For internal communication between the S- 9-1. Control Program for PC Box and LED cabinets, use ports 1515, 48484, 48485 and 58585 When firewalls / security network are in use, make sure the corresponding port between the S-Box and LED cabinets is enabled.
  • Page 113 9. LSM configuration and usage description 9-1. Control Program for PC Connection layout: Use the S-Box output source section to adjust the LED cabinet layout by rearranging cabinets. Feature View : Align, Layout preset, Export and Import for Cabinet Layout Device Information/Setting View: Shows LED cabinet information based on the following categories.
  • Page 114 9. LSM configuration and usage description 9-1. Control Program for PC Device Connection list Connected S-Boxes, Edit connection and Delete, Group information Connection layout (View Port) Cabinet’s layout Category View: Use the Home and Connections tabs to configure system settings. Device Information/Setting View: S-Box Settings, Cabinet Settings Sub Information View:...
  • Page 115 9. LSM configuration and usage description 9-1. Control Program for PC 1. Basic : . On/Off, Input source, Screen Mute / Freeze, Menu Size 2. Picture . Picture Mode, Brightness / Contrast / Sharpness, Color, Tint(G/R), Color Temp(K), Gamma, White Balance 3.
  • Page 116 9. LSM configuration and usage description 9-1. Control Program for PC 6. Cabinet Settings . Pixel RGB Data Reload / Request . OnScreen Display On / Off . LED Brightness . Software Update 7. Cabinet Calibration . Cabinet / Module / Edge .
  • Page 117 9. LSM configuration and usage description 9-1. Control Program for PC • RGB CC control for Cabinet and Module • Edge Correction RGB CC control (Single / Multi) • Gradation control LED R&D Lab(VD)
  • Page 118 9. LSM configuration and usage description 9-1. Control Program for PC Monitor Window: You can check the MDC communication log during extraction by Export button LED Signage Cabinet: IC and Power information LED Signage Box: Basic information (IP address, MAC address, Serial number, Versions, Model Name), Number of LED Cabinet (All, Connect, Unconnected)
  • Page 119 9. LSM configuration and usage description 9-1. Control Program for PC Options Command Retry Count Error Status Interval (Enable / Disable) Temperature Alert Support Language Advanced Log Management Mail alert Change Password About Software Check current version Update (for LSM) LED R&D Lab(VD)
  • Page 120 9. LSM configuration and usage description 9-1. Control Program for PC S-Box > Click Dehumidification icon Start Dehumidification mode (24 hours) Check progress You can Stop it by “Stop” button LED R&D Lab(VD)
  • Page 121 9. LSM configuration and usage description 9-1. Control Program for PC Use test pattern of S-Box – Used for cabinet installation ※ When Test Pattern is turned ON, OFF or changed, the background screen may be displayed for a while due to Overlay layer switching LED R&D Lab(VD)
  • Page 122 9. LSM configuration and usage description 9-1. Control Program for PC Keep LED cabinet’s Power to be not turned off for redundancy installation. Follow next steps to enable it. A. Close LSM and move to the LSM installation path B. Open LEDDisplayManagement_Config.xml file as Edit mode C.
  • Page 123 ※ Please use the latest version of software. ※ You can download the latest version via SLM web sites. - Site URL : https://displaysolutions.samsung.com/support/resources/product-support - Make sure the red parts are the same as the actual version of the products.
  • Page 124 9. LSM configuration and usage description 9-2. Software Update – Cabinet 2. Click “Software Update” of Cabinet Settings ※ Files are different according to update method (LSM or USB) for AM3352 ※ Another tool is needed to update FPGA for USB using. L-IWBMWWAC-xxxx.x Code Release L-IERMWWAC-1001.0 FPGAFW-2525218466...
  • Page 125 9. LSM configuration and usage description 9-2. Software Update – Cabinet ※ Files are different according to update method (LSM or USB) for AM3352 ※ Another tool is needed to update FPGA for USB using. L-IWAMWWAC-xxxx.x Code Release Prepare the following items. L-IFAMWWAC-xxxx.x Code Release - USB memory formatted in FAT32 format - Copy the update file to the USB root folder...
  • Page 126 9. LSM configuration and usage description 9-2. Software Update – S-Box 1. Prepare software file to be updated. (The file in the red box will be selected for software update.) 2. Click button in S-Box settings 3. Choose prepared file by clicking button.
  • Page 127 1) OSCAR-P Main Micom Software upgrade • USB Download Firmware upgrade downloaded from the "www.samsung.com" website 1. Connect the USB drive where the files are stored to the set. (Be careful not to disconnect the power or USB drive during the upgrade.) 2.
  • Page 128 9. LSM configuration and usage description 9-2. SW update – S-Box ② Update via USB 1) OSCAR-P Main Micom software upgrade Save the “SB-OSCPSBAWWC” folder to the USB root. Connect USB. Click the “MENU” key on the remote control. Select the “Customer Support” menu. Select the “Software Update”...
  • Page 129 9. LSM configuration and usage description 9-2. SW update – S-Box ② Update via USB 2) Sub Micom Upgrade (You can upgrade Sub Micom in Factory Mode. It takes about 1-2 minutes.) Save the “OSPMICOM_LXTV_SS.bin” file to the USB root. Connect USB.
  • Page 130 9. LSM configuration and usage description 9-2. SW update – S-Box ② Update via USB SE19HM02 (Novatek), KU060/K325T (FPGA) Software Upgrade ※ Screen blinking may occur during Firmware update Save the necessary files to each folder on the USB root. •...
  • Page 131 9. LSM configuration and usage description 9-2. SW update – S-Box ② Update via USB 4) Valens TX/RX upgrade (You can upgrade your Valens TX/RX in Factory Mode. It takes about 20 minutes.) Save the “TB-VSTXSHWWS.bin” and “TB-VSRXSHWWS.bin” files to the USB root. Connect USB.
  • Page 132 9. LSM configuration and usage description  OSD Information The OSD information of the cabinet can be turned on/off through the LSM. AM3352 firmware name & version [P0.94 4K, 3x3 LSM ] SMPS Status (VX : OK, VO : NG) MS : Master, SL : Slave FPGA firmware version ℃...
  • Page 133 9. LSM configuration and usage description  Module Information check each module information of the cabinet through LSM. LED Bin information of each module LED R&D Lab(VD)
  • Page 134: (See Separate Manual When Installing B2C M-Box)

    Contents 1. Product Information and Installation Precautions 2. Preparation for Cabinet Installation 3. Frame Kit Components 4. Frame Installation 5. Cabinet Installation 6. Frame Bezel Components 7. Frame Bezel Installation 8. S-BOX installation and connection (see separate manual when installing B2C M-BOX) 9.
  • Page 135 S-Box Network IP Settings ■ S-Box Network IP setting using PC Using the file explorer, go to the folder where LSM is installed, Run [Start]-Programs-Samsung-LED Signage Manager-Network Configuration. Connect PC and S-Box with RS232C Cable, select the connected Serial Port, and click Open button to connect.
  • Page 136 Appendix 2 - S-Box Installation and Connection • Cautions when installing S-Box (SNOWJAU/SNOWAAE) ① It is recommended to install it in a 19inch Server rack. ② Install so that the vents are open and do not turn sideways or overturn. ③...
  • Page 137 Appendix 2 - S-Box Installation and Connection ★ Orderly Rolled Random Rolled ★ • S-Box Connection (Recommend) (Not Recommend) ⑧ Instruction for handling HDBaseT (HDBT) cable  Use HDBase-T cables with 15 meter long at minimum and 100 meter long at maximum.
  • Page 138 Appendix 2 - S-Box Installation and Connection • S-Box Connection ⑨ Finishing method for HDBase-T Cable  STP RJ45 shielded Plug. RJ45 Connector should be CAT6 or CAT7 shielded RJ45 and load bar. Load bar  Inserting a conductor (conductor) into the plastic loader: Insert the conductor into the load bar of the RJ45 connector as shown below in the conductor structure (T-568B).
  • Page 139 Appendix 2 - S-Box Installation and Connection • S-Box Connection ⑨ Finishing method for HDBase-T Cable Push the plastic loader as close as possible: Push the plastic load bar as close as possible to the cable.  Cut all the wires leaving about 0.5” with a wire cutter. ...
  • Page 140 Appendix 2 - S-Box Installation and Connection • S-Box Connection ⑩ Finishing method for HDBase-T Cable • Drain wire is combined on the cable jacket as shown in the figure below using pliers. • Soldering the drain wire to the metal part of the RJ45 connector: After soldering the drain wire to the metal part of the RJ45 connector, cut off unnecessary parts.
  • Page 141 Appendix 2 – Optical cable loss • Cable Loss according to Random mating Grade Random mating Cable loss Garde A 0.07 dB≤ Grade A ≤ 0.15 dB Garde B 0.12 dB≤ Grade B ≤ 0.25 dB Garde C 0.25 dB≤ Grade C ≤ 0.50 dB Garde D 0.50 dB≤...
  • Page 142 Appendix 3 - S-BOX Accessory List ◆ Accessories configuration (SNOW-JMU) BN68-12473A BN68-01146G ※ 표 참고 4301-000103 BN59-01234A BN39-01545B BN44-00924A BN39-02776A BN96-49229A BN96-49132A BN59-01317A BN39-02473C BN61-16067A 6003-000133 6003-001150 【 Power cord by Region】 POWER CODE 3903-001117 3903-001118 BN63-18456A BN39-02466B BN96-54035A KOREA 3903-001074 CHINA 3903-001075...
  • Page 143 Appendix 4 – AAE S-BOX Specification ◆ SNOW-AAE Model Specification MODEL SBB-SNOWAAE PANEL Input HDMI1~4 In, DP In, RS232(for Service), 외장 IR/Eco, 외장 BT/WiFi, RJ45 LAN, USB, Power 24V Output DVI (for service), OC 8EA (to Cabinet), HDBT (for External BT/WiFi), SPDIF [Default] 3840*2160@60 Hz Input [Max] 7680 x 4320 @ 60 Hz (DP, HDMI 4), 3840 x 2160 @ 60 Hz (HDMI 1~3)
  • Page 144 Appendix 5 – AAE S-Box How to set Multiview function ◆About Multiview function • When the selection button is pressed on the remote control while the Multi View is active, you can set to change the source and screen size, delete the screen and exit to full screen. •...
  • Page 145 Appendix 5 – AAE S-Box How to set Multiview function ◆ 4 HDMI (Borderless) Setting method ◆ 4 HDMI Setting method ① “Source” Select -> “Multiview” Select ① “Source” Select -> “Multiview” Select ② “4HDMI(Borderless)” Select ② “4HDMI” Select ③ Boardless Layout image display (video: 8K60Hz voice: HDMI1) ③...
  • Page 146 Appendix 5 – AAE S-Box How to set Multiview function ◆ Layout Configuration ◆ Saving Layout Configuration • Content Selection Mode • Change source Other HDMI source can be selected. • Change screen size It is possible to save layouts. Screen size can be changed to large or small.
  • Page 147 Appendix 5 – AAE S-Box How to set Multiview function ◆ Supported resolution list LED R&D Lab(VD)
  • Page 148 Thank you...

This manual is also suitable for:

Lh009iwbmesLh006iwbmes

Table of Contents