Ametek 5100 HD User Manual page 34

Tunable diode laser spectrometer
Hide thumbs Also See for 5100 HD:
Table of Contents

Advertisement

3-6 | Model 5100 HD Analyzer
Connections to the Model 5100 HD are made at the power entry terminal block.
It is located in the customer connection box.
Remove the cover of the customer connection box by removing the screws
holding it in place and lifting the cover upward and away from the box.
Locate the power entry terminal block to make connections to the AC power
line.
Thread the AC mains supply wiring through the conduit entry port on the
customer connection box and connect as shown below.
Mains supply connections to the terminal block are as follows:
Line =
Line connection
Neutral =
Neutral connection (USA)
Ground =
Ground connections
The 5100 HD must be ordered for either 120 VAC or 240 VAC since the oven
heater is voltage-specific.
24 VDC Wiring for 5100 HD:
GND 24V RET
+24 VDC

Advertisement

Table of Contents
loading

Table of Contents