IBM Flex System p270 Compute Node Installation And Service Manual page 58

Table of Contents

Advertisement

8. Carefully open the retaining clips (A) on each end of the DIMM connector by pressing them in the
direction of the arrows. Remove the DIMM (B).
Figure 16. Removing a DIMM
9. Install a DIMM filler (C) in any location where a DIMM is not present to avoid machine damage.
Note: Before you replace the compute node cover, ensure that you have at least the minimum
DIMM configuration installed so that your compute node operates properly.
10. If you are instructed to return the DIMM, follow all packaging instructions, and use any packaging
materials for shipping that are supplied to you.
11. Install and close the compute node cover. See "Installing and closing the compute node cover" on
page 34.
Statement 21
CAUTION:
Hazardous energy is present when the compute node is connected to the power source. Always
replace the compute node cover before installing the compute node.
12. Install the compute node into the IBM Flex System Enterprise Chassis. See "Installing the compute
node in an IBM Flex System Enterprise Chassis" on page 92.
46
Power Systems: IBM Flex System p270 Compute Node Installation and Service Guide

Advertisement

Table of Contents
loading

Table of Contents