D101C00F • D1061XXX
D101C00F
Explanation: No power off to allow debugging for CPU controls
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1021XXX
Explanation: Dump dump header directory
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1031XXX
Explanation: Dump dump header fips header
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1041XXX
Explanation: Dump dump header entry header
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1051XXX
Explanation: Dump core file for failing component
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1061XXX
Explanation: Dump all NVRAM
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
281
Chapter 8. Troubleshooting

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Flex System p270 Compute Node and is the answer not in the manual?

Questions and answers

Table of Contents