D1XX3Y03 • D1XX3Y08
D1XX3Y03
Explanation: Get array values
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1XX3Y04
Explanation: Stop the clocks
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1XX3Y05
Explanation: Flush the cache
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1XX3Y06
Explanation: Get CFAM
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1XX3Y07
Explanation: Put SCOM
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1XX3Y08
Explanation: Send command
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
289
Chapter 8. Troubleshooting
Need help?
Do you have a question about the Flex System p270 Compute Node and is the answer not in the manual?
Questions and answers