This appendix contains a step-by-step list of items you should complete before
your FOCUS GC arrives. Please complete the checklist after reading the Site
Preparation section. This will ensure that your site is suitable for the installation
of your new FOCUS GC. Please contact a Thermo Fisher Scientific Customer
Support Engineer (CSE) if you encounter any difficulties preparing your site for
installation.
Ensure that entrances and hallways are at least 92 cm (37 in.) across.
Ensure that your workbench space is at least 1.5 m (4.5 ft) across and can support
a 75 kg (170 lb) load.
Ensure that the instruments can be placed on surfaces that do not vibrate.
Ensure that your work area has proper lighting.
Provide an acceptable power source for your FOCUS GC system.
Provide a wall outlet configuration that meets specifications.
Ensure that the temperature in your laboratory is between 15 and 35 C (65 and
95 F).
Ensure that the relative humidity level in your laboratory is between 40 and 80%,
with no condensation.
Ensure that the air in your laboratory is free of excessive dust, smoke, or other
particulate matter.