Installation - Thermo Scientific FOCUS GC Site Preparation And Installation Manual

Gas chromatograph
Hide thumbs Also See for FOCUS GC:
Table of Contents

Advertisement

Installation

Installation
If you have purchased the installation option, you must submit a completed
Preinstallation Checklist (Appendix A) to us before a Thermo Fisher Scientific
CSE will install your system.
The CSE will unpack and completely install the system, including optional
instruments. The CSE will also initialize settings, verify that the system is
operating according to specifications, and familiarize you with the system.
Contact your local Thermo Fisher Scientific office for details.
If you have not purchased the installation option, refer to Section II, Installation,
for installation instructions.
Site Preparation and Installation Manual
Chapter 2
Instrument Arrival
43

Advertisement

Table of Contents
loading

Table of Contents