Pre-Installation Checklist - Thermo Scientific iCAP 7000 Series Reference Manual

Icp-oes spectrometer
Hide thumbs Also See for iCAP 7000 Series:
Table of Contents

Advertisement

7 Pre-Installation Checklist

This checklist is to be filled in by the customer to confirm that all relevant factors concerned with
the installation have been considered and dealt with.
On completion of the list, a copy should be forwarded to the local Thermo Fisher
Scientific organisation with a request for installation to be carried out. Failure to send the
checklist may result in delays with the instrument installation, any delays may incur extra charge.
Company name:
Company representative name:
Position:
Location
Table dimensions for the spectrometer
Table dimensions for the auto sampler (right side of the
spectrometer)
Table dimensions for keyboard and mouse (left side of the
spectrometer)
Extraction
Tube diameter for extraction
Extraction capability (at the instrument)
Adjustable valve in the extraction tube
Electrical supply
Plug 200-240 VAC, 20-32A, single phase 4000 W, 50/60 Hz
Standard mains plug 200-240 VAC for each accessory
Required
900 x 600 mm
600 x 550 mm
600 x 30 mm
125 mm
10 m/s (Duo)
5 m/s (Radial)
Yes
Yes
Yes
Checked

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents