Assemble And Mount The Mixer - Raven Sidekick Pro Quick Installation Reference

Table of Contents

Advertisement

CHAPTER 3

ASSEMBLE AND MOUNT THE MIXER

1. Assemble the mixer as shown in Figure 6, "Mixer Assembly," shown below.
FIGURE 6. Mixer Assembly
Item
No.
1
Assembly, M220 Flanged Mixer/Check Valve
2
Clamp, 2" V-Band
3
Seal, M220
4
Fitting, M220-200 Banjo Flanged
5
Flow Meter, RFM 60P (Deutch DT, HP, 2 Magnet Turbine)
6
Gasket, 1-1/2" Viton 150G Pakking
7
Fitting, 8mm x R1/4 Male Stud Elbow BSPT Push-in
8
Valve, 8mm In-line Non-return Push-in
9
Clamp, M8 x 60mm Exhaust
NOTE:
Figure 7 on page 11 offers and example of the check valve and the push-in fitting.
2. Mount the mixer near the inlet of the boom.
NOTE:
Refer to Figure 8 on page 11 for an example of mounting the assembly to the implement.
NOTE:
Gaskets, V-bands, the mixer, flow meter, and connector are included in the RCM - Sprayer ratio rate
injection kit (P/N 117-7100-049). The flange couplings to the existing product carrier lines are not
included in the kit. These items need to be ordered separately. The size of the connector at the flow
meter is M200. The size of the connector at the end of the mixer is M220.
3. Place a 3-way hand valve up-stream from the check valve if possible. This valve may be used to drain the
system or for a manual catch test.
10
Description
RCM - Sprayer with Sidekick Pro™ ICD Ratio Rate Quick Installation Reference
Part Number
063-0173-737
435-3003-048
219-0000-138
333-0002-366
063-0173-291
219-0000-180
333-0014-002
333-0014-004
311-9000-030

Advertisement

Table of Contents
loading

This manual is also suitable for:

117-7100-049-c

Table of Contents