Rack Mount Installation - ABB PowerValue 11 RT G2 User Manual

Hide thumbs Also See for PowerValue 11 RT G2:
Table of Contents

Advertisement

12
A B B U P S P R O D U C T S A N D S O L U T I O N S
3 .2 .4
3.2.4.1-1:
3 .2 .4 .1 UPS
Ear bracket
Note that you need a rack-mounting kit
3.2.4.1-2:
(purchased separately) for this operation. This
Rack rails
procedure is suitable for 19-inch rack cabinet
3.2.4.1-3:
installation with a minimum depth of 800 mm.
Rack-mount installation
3.2.4.2-1:
Identify the final position and keep 2U spacing
Front panel removal
for this installation.
3.2.4.2-2:
Battery plug
disconnection
1. Install the ear bracket onto the unit using the
M4 flathead screws (figure 3.2.4.1-1).
3.2.4.2-3:
Battery module
2. Slide the unit into the rail kit and make
connection
sure the rack-mounting screw is tightened
3.2.4.2-4:
(figure 3.2.4.1-2, 3.2.4.1-3).
Battery module
3. After installing the UPS into the rack, proceed
connection
with the connection of the load to the UPS.
Make sure the load equipment is turned off
before plugging it into the output receptacles.
3.2.4.1-1
3.2.4.1-2
3.2.4.1-3
3 .2 .4 .2 External battery modules
Identify the final position and keep 2U spacing for
this installation; it is recommended that this
spacing is provided below the UPS.
1. Install the ear bracket onto the unit with
the flathead M4 screw. (figure 3.2.4.1-1).
2. Slide the unit into the rail kit and make sure
the rack-mounting screw is tightened
(figure 3.2.4.1-2, 3.2.4.1-3).
3. Turn off UPS, remove Power plug from the mains.

Rack mount installation

4. Turn off the circuit breaker on external
battery bank.
5. Remove front panel, disconnect internal
battery connector (figure 3.2.4.2-1, 3.2.4.2-1).
1
3.2.4.2-1
3.2.4.2-2
6. Connect the EBM to the UPS with the battery
power cable (figure 3.2.4.2-3).
7. Install the fixing plate to fix the battery cable
(figure 3.2.4.2-4)
3.2.4.2-3
3.2.4.2-4